jaspector
City building permits

City of Greenwood

How to apply for a building permit in City of Greenwood, Arkansas. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

City of Greenwood Planning and Development Department

Street address
Greenwood City Hall, 30 Bell Road, Greenwood, AR 72936
Coverage
Covers all construction within the incorporated city limits of Greenwood, which serves as one of the two county seats for Sebastian County. Projects in unincorporated areas surrounding Greenwood are not covered by this department.
Online portal
TEKConnectGov
TEKConnectGov
§ 02

When a permit is required

Permit triggers and exempt work for Greenwood

Additions and remodeling; commercial and industrial signs; construction of new residential, commercial, and industrial structures; electrical, plumbing, and mechanical (HVAC) installation and replacement; excavations within city limits; home-based businesses; water heater replacement; storage buildings or accessory structures; storm shelters; swimming pools; underground yard sprinklers and spigots; new fences and fence repairs; all activity within the FEMA special flood hazard area.

Building code
2021 Arkansas Building Code (IBC 2021, effective January 1, 2023); 2021 Arkansas Residential Code (IRC 2021, effective January 1, 2023); 2021 Arkansas Fire Code (IFC 2021, effective January 1, 2023); 2021 Arkansas Mechanical Code (IMC 2021, effective July 1, 2022); 2018 Arkansas Plumbing Code (IPC 2018, effective September 1, 2021); 2018 Arkansas Fuel Gas Code (IFGC 2018, effective September 1, 2021); Arkansas Energy Code (2009 IECC, effective January 1, 2015).
Owner-builder
Not detailed in available sources. Contact the department.
Contractor requirements
Arkansas state contractor licensing requirements apply. Contractors must be licensed with the Arkansas Contractors Licensing Board. Contact the department for any additional city-level registration requirements.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Create an account or log in at https://greenwood-ar.tekconnectgov.com.
  2. 02
    Select the appropriate permit type.
  3. 03
    Complete the permit application and upload required plans or documents.
  4. 04
    Submit application. Department staff reviews the application.
  5. 05
    Pay permit fees online through the portal or in person at City Hall.
  6. 06
    Permit issued upon approval and fee payment.
  7. 07
    Post permit at job site before work begins.
  8. 08
    Schedule inspections through the portal as work progresses.
  9. 09
    Request final inspection upon project completion.

Source: City of Greenwood Planning and Development Department ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Monday through Thursday 8:00 a.m. to 5:00 p.m.; Friday 8:00 a.m. to 4:00 p.m.

Typical sequence: Not detailed in available sources. Contact Building Inspector Hunter Mikles at 479-322-1675.

§ 05

Frequently asked

Common questions about Greenwood permits

01 Do I need a building permit in Greenwood, AR?
Additions and remodeling; commercial and industrial signs; construction of new residential, commercial, and industrial structures; electrical, plumbing, and mechanical (HVAC) installation and replacement; excavations within city limits; home-based businesses; water heater replacement; storage buildings or accessory structures; storm shelters; swimming pools; underground yard sprinklers and spigots; new fences and fence repairs; all activity within the FEMA special flood hazard area.
02 How do I apply for a building permit in Greenwood, AR?
To apply for a building permit in Greenwood, AR, follow these steps: 1. Create an account or log in at https://greenwood-ar.tekconnectgov.com. 2. Select the appropriate permit type. 3. Complete the permit application and upload required plans or documents. 4. Submit application. Department staff reviews the application. 5. Pay permit fees online through the portal or in person at City Hall. 6. Permit issued upon approval and fee payment. 7. Post permit at job site before work begins. 8. Schedule inspections through the portal as work progresses. 9. Request final inspection upon project completion.
03 How do I schedule a building inspection in Greenwood, AR?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Greenwood, AR via: TEKConnectGov portal.
last verified April 2026 source City of Greenwood Planning and Development Department ↗ entry id permits/arkansas/sebastian/greenwood

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Greenwood Planning and Development Department before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Sebastian County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Sebastian County jurisdictions →