When a permit is required
Permit triggers and exempt work for Foreman
Required before construction of single-family residences, multiple-family residences, business/commercial/manufacturing buildings, public utilities, and remodeling or renovation exceeding 50 percent of appraised value of the subject structure.
- Application with name
- Mailing address
- Telephone number
- Building type
- Site location
- Outside dimensions
- Materials
- Anchoring method
- First-floor elevation data
- Proposed start date
- Building code
- Title 11, Chapter 11.28 (building code chapter is referenced; current model code edition not provided)
- Permit validity
- 90 days from issue unless renewed
Application process
Typical processing: Next regular or called City Council meeting
- 01 Land owner submits application to the Mayor at City Hall in duplicate copy.
- 02 Application must include applicant identity and contact info, building type, site location, building dimensions, construction materials, anchoring method, first-floor height before and after grading, and proposed start date.
- 03 Mayor presents the application to the City Council at its next regular or called meeting.
- 04 Council approves or otherwise disposes of the application.
- 05 Issued permit remains valid for 90 days and becomes void if work has not begun, unless renewed.
Typical processing time: Next regular or called City Council meeting
Source: City of Foreman, Mayor and City Council process under Title 11 ↗
Fee schedule
Foreman building permit fees
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Inspection hours
- City Hall hours are Monday-Friday, 9:00am-4:00pm, with lunch closure from 12:00pm-1:00pm
Typical sequence: Application to Mayor, then City Council approval, then issuance
Frequently asked
Common questions about Foreman permits
01 Do I need a building permit in Foreman, AR? ▸
02 How much does a building permit cost in Foreman, AR? ▸
03 How do I apply for a building permit in Foreman, AR? ▸
04 How long does it take to get a building permit in Foreman, AR? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Foreman, Mayor and City Council process under Title 11 before applying. Jaspector is not legal advice.