On this page 6
When a permit is required
Permit triggers and exempt work for Malvern
The city building page routes users to permit applications, permit submittal, and the municipal code; the fee schedule indicates permits are required for residential, commercial, plumbing, electrical, mechanical, roofing, fences over 7 feet, signs, street cuts, and work in the right of way.
- Exempt Accessory buildings less than 200 square feet have no fee permit in the fee schedule
Note: FAQ and fee schedule indicate exemptions and limited owner/trade exceptions, but no single city exemption list was published on the permit page
- Plot plan
- Construction drawings when required by code
- Detailed drawings for signs
- Lot line and setback information
- Other materials depending on work type
- Building code
- 2021 Arkansas Fire Prevention Code Vol I, II, III; 2021 Arkansas Mechanical Code; 2020 NEC; 2018 Arkansas Fuel Gas Code; 2018 Arkansas Plumbing Code; 2018 Arkansas Energy Code; 2021 International Property Maintenance Code
- Permit validity
- Permits expire one year from issuance; work must begin within six months; extensions may be granted in 90 day increments for $40 each
- Owner-builder
- Residential owner-occupant and limited owner-builder exceptions are described in the city FAQ
- Contractor requirements
- City FAQ states licensed contractor requirements with exceptions for certain owner and low-value work; licensed tradesman required for most plumbing, electrical, and HVAC work outside limited exceptions
Source: City of Malvern Code Enforcement / Building Official ↗
Application process
Application → plan check → issuance → inspection → final
- 01 Review the city building page and permit applications.
- 02 Prepare the permit application, plot plan, and any required construction drawings.
- 03 Submit plan review materials when required.
- 04 Pay permit and plan review fees.
- 05 Obtain permit issuance from the city building official.
Source: City of Malvern Code Enforcement / Building Official ↗
Fee schedule
Malvern building permit fees
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
Typical sequence: Residential permits include three inspections: footing, framing, and final; plumbing new construction includes rough-in, top-out, and final; electrical new construction includes in-wall and final; mechanical new construction includes duct and final
Frequently asked
Common questions about Malvern permits
01 Do I need a building permit in Malvern, AR? ▸
02 How much does a building permit cost in Malvern, AR? ▸
03 How do I apply for a building permit in Malvern, AR? ▸
04 What work is exempt from building permits in Malvern, AR? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Malvern Code Enforcement / Building Official before applying. Jaspector is not legal advice.