When a permit is required
Permit triggers and exempt work for Heber Springs
Required for construction and most work affecting structural, electrical, plumbing, mechanical, fences, roofs, water/sewer work, irrigation connections, siding when structural elements are exposed, and new construction including engineered or prefabricated structures.
- Exempt Cosmetic work such as painting, tiling, carpeting, and replacing cabinets
- Exempt Replacing shingles or roofing materials without decking replacement
- Exempt Replacing an existing fence with like materials
- Site plan
- Plans
- Before and after floor plans for remodels
- Permit application
- Permit validity
- 1 year as long as work is receiving inspections. Extensions may be granted by the building official.
- Owner-builder
- Homeowners who own and occupy the property as their main residence can do their own building, plumbing, electrical, or mechanical work, but still need permits and inspections. If they hire someone else, that person must pull the permit.
- Contractor requirements
- Trade permits are required separate from the building permit and should be requested by the contractor completing the work.
Application process
Application → plan check → issuance → inspection → final
- 01 Start by confirming whether work needs a permit and collecting required submittals.
- 02 Submit by visiting the Planning and Zoning Division at 1001 W Main St or via the online permit portal.
- 03 New construction and additions require a site plan and plans including elevations, floor plans, plumbing, and electrical.
- 04 Remodels require before and after floor plans of the entire house with room labels, door and window sizes, and locations of new or moved electrical and plumbing.
- 05 Trade permits are separate from the building permit and are pulled by the contractor doing the work.
Source: Planning and Zoning Division of the Heber Springs Fire Department ↗
Fee schedule
Heber Springs building permit fees
Required inspections
Scheduling and sequence
- 501-362-8303 (phone)
- TekConnectGov portal (online)
- Scheduling deadline
- Minimal 24 hour notice required for framing, gas/electric service, and final inspections.
- Inspection hours
- Inspections are scheduled between 8:30am and 4:00pm daily.
Source: Planning and Zoning Division of the Heber Springs Fire Department ↗
Frequently asked
Common questions about Heber Springs permits
01 Do I need a building permit in Heber Springs, AR? ▸
02 How do I apply for a building permit in Heber Springs, AR? ▸
03 What work is exempt from building permits in Heber Springs, AR? ▸
04 How do I schedule a building inspection in Heber Springs, AR? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Planning and Zoning Division of the Heber Springs Fire Department before applying. Jaspector is not legal advice.