On this page 5
When a permit is required
Permit triggers and exempt work for Marana
Building permits are required for most construction projects. Town publishes project-specific guidance identifying work that does and does not require permits.
- Exempt Accessory buildings under 200 square feet (with common exemption thresholds)
Note: Town publishes project-specific guidance on permit requirements. Review current guidance to confirm exemption status.
- Completed permit application
- Construction drawings and specifications
- Site plan
- Owner authorization if applicable
- Building code
- 2024 IRC, IBC, IEBC, IPC, IMC, IPMC, IFC, IFGC, ISPSC, and 2023 NEC with local amendments. Effective July 18, 2025 for all new applications.
Source: Development Services ↗
Application process
Application → plan check → issuance → inspection → final
- 01 Review project-specific guidance on the Need-a-Permit page to identify permit requirements.
- 02 Access Permit Tracker or contact Development Services One-Stop Shop for application assistance.
- 03 Prepare permit application and construction plans per town requirements.
- 04 Submit through Permit Tracker or with Development Services staff.
- 05 Town planning, building code, and engineering review for approval.
- 06 Address any corrections from plan review.
- 07 Pay permit fees.
- 08 Obtain building permit and begin work.
- 09 Schedule inspections through Permit Tracker.
Source: Development Services ↗
Required inspections
Scheduling and sequence
Frequently asked
Common questions about Marana permits
01 Do I need a building permit in Marana, AZ? ▸
02 How do I apply for a building permit in Marana, AZ? ▸
03 What work is exempt from building permits in Marana, AZ? ▸
04 How do I schedule a building inspection in Marana, AZ? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Development Services before applying. Jaspector is not legal advice.