jaspector
County building permits

Unincorporated Greenlee County

How to apply for a building permit in unincorporated Greenlee County, Arizona. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Greenlee County Planning and Zoning Department

Street address
253 Fifth St., Clifton, AZ 85533 (Engineer's Office, second floor of annex next to Health Department)
Coverage
All properties in unincorporated areas of Greenlee County, excluding incorporated Towns of Clifton and Duncan.
Online portal
SmartGov Online Portal
SmartGov
§ 02

When a permit is required

Permit triggers and exempt work for Greenlee County

Building permits are required for construction of site-built homes and development on private property in unincorporated Greenlee County. Zoning use permits are required in most cases. Floodplain permits are required for work in flood-prone areas.

Required documents
  • Completed permit application
  • Zoning permit application
  • Plans or drawings (if required for specific project)
  • Special power of attorney form (if applicable)
Building code
None. Greenlee County has not adopted a building code. The county processes permits for zoning and floodplain compliance, but does not conduct plan review, construction inspection, or issue certificates of occupancy.
§ 03

Application process

Typical processing: Varies; contact county for specific project timelines.

  1. 01
    Determine whether your project requires a zoning use permit, building permit for site-built home, and/or floodplain permit.
  2. 02
    Complete the zoning permit application and submit through SmartGov portal or in person at Planning and Zoning.
  3. 03
    Some permits may be issued by telephone; contact Planning and Zoning to discuss your project.
  4. 04
    Pay the zoning use permit fee (no charge for building permit when issued with zoning permit).
  5. 05
    For manufactured homes or septic systems, contact Greenlee County Health Department for separate permits.
  6. 06
    Obtain confirmation of permit approval and zoning authorization before beginning work.

Typical processing time: Varies; contact county for specific project timelines.

Source: Greenlee County Planning and Zoning Department ↗

§ 04

Fee schedule

Greenlee County building permit fees

Fee type
Amount
01
Permit fee formula
Building permit is issued at no cost when zoning use permit is issued; fee is charged for zoning use permit. Consult county for current fee schedule.
§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (928) 865-4762 (phone)

Typical sequence: Greenlee County does not conduct construction inspections or issue certificates of occupancy. Zoning and floodplain compliance is verified administratively.

Source: Greenlee County Planning and Zoning Department ↗

§ 06

Frequently asked

Common questions about unincorporated Greenlee County permits

01 Do I need a building permit in unincorporated Greenlee County, AZ?
Building permits are required for construction of site-built homes and development on private property in unincorporated Greenlee County. Zoning use permits are required in most cases. Floodplain permits are required for work in flood-prone areas.
02 How much does a building permit cost in unincorporated Greenlee County, AZ?
Building permit fees in unincorporated Greenlee County, AZ are set by the local building department and vary by project type and valuation. Fees are calculated as: Building permit is issued at no cost when zoning use permit is issued; fee is charged for zoning use permit. Consult county for current fee schedule..
03 How do I apply for a building permit in unincorporated Greenlee County, AZ?
To apply for a building permit in unincorporated Greenlee County, AZ, follow these steps: 1. Determine whether your project requires a zoning use permit, building permit for site-built home, and/or floodplain permit. 2. Complete the zoning permit application and submit through SmartGov portal or in person at Planning and Zoning. 3. Some permits may be issued by telephone; contact Planning and Zoning to discuss your project. 4. Pay the zoning use permit fee (no charge for building permit when issued with zoning permit). 5. For manufactured homes or septic systems, contact Greenlee County Health Department for separate permits. 6. Obtain confirmation of permit approval and zoning authorization before beginning work.
04 How long does it take to get a building permit in unincorporated Greenlee County, AZ?
Building permit processing times in unincorporated Greenlee County, AZ typically run Varies; contact county for specific project timelines.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in unincorporated Greenlee County, AZ?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in unincorporated Greenlee County, AZ via: (928) 865-4762.
last verified April 2026 source Greenlee County Planning and Zoning Department ↗ entry id permits/arizona/greenlee/unincorporated

Educational reference. Permit rules and fees change — confirm current requirements directly with Greenlee County Planning and Zoning Department before applying. Jaspector is not legal advice.