jaspector
§ Chapter 13 IRC 2024

General Mechanical System Requirements

8 entries from Chapter 13 of IRC 2024, organized by section number. Each entry covers what the code requires, why it exists, what inspectors look for, and common mistakes.

§ 01   Sections

All 8 entries.

Sorted by section number. Click any row for the full entry — answer, requirements, edition diff, related sections.

IRC 2024 Mechanical Inspection: What Inspectors Check at Rough-In and Final
M1301
What does an IRC 2024 mechanical inspection cover at rough-in and final stages?
IRC 2024 Mechanical Permits: What Work Requires a Permit and Inspection
M1301.1
What mechanical work requires a permit under IRC 2024?
IRC 2024 Mechanical Equipment Listing: UL, ETL, and AGA Certification Requirements
M1301.2
Does IRC 2024 require mechanical equipment to be UL listed or certified by an approved lab?
IRC 2024 Fuel-Burning Appliance Clearances: Minimum Distance from Combustibles
M1303
What clearances from combustibles does IRC 2024 require for gas furnaces and fuel-burning appliances?
IRC 2024 Mechanical Room: Minimum Size, Clearances, and Combustion Air
M1305
Does IRC 2024 specify a minimum size for a mechanical room?
IRC 2024 HVAC Access Panels: Clearances and Accessibility for Mechanical Equipment
M1305.1
What access clearances does IRC 2024 require for HVAC and mechanical equipment?
IRC 2024 Heating System Design: Manual J and Whole-House Load Calculation
M1401.3
Does IRC 2024 require a Manual J load calculation for HVAC sizing?
IRC 2024 Condensate Lines: Primary Drain, Secondary Pan, and Float Switch Requirements
M1411.3
What does IRC 2024 require for HVAC condensate drains and overflow protection?