Energy Efficiency
10 articles
-
Continuous Air Barrier Requirements for New Homes Under IRC 2024
What are the continuous air barrier requirements in IRC 2024?
N1102.4
-
Duct Leakage Testing Requirements Under IRC 2024
Is a duct leakage test required under IRC 2024?
N1103.3.3
-
IRC 2024 Insulation R-Value Requirements by Climate Zone
What are the insulation R-value requirements in IRC 2024?
N1102.1
-
IRC 2024 Requires 200-Amp Service and EV-Ready Panel Capacity
Does IRC 2024 require a 200-amp electrical panel for new homes?
N1103.9
-
IRC 2024 Requires Heat Pump Water Heater Ready Circuit in New Homes
Does IRC 2024 require heat pump water heater wiring?
N1103.5.3
-
IRC 2024 Requires Solar-Ready Zone and Conduit on New Homes
Does IRC 2024 require solar-ready wiring on new homes?
N1104.1
-
IRC 2024 Tightens Blower Door Test to 3 ACH50 in Most Climate Zones
What is the blower door test requirement in IRC 2024?
N1102.4.1.2
-
Mechanical Ventilation Requirements for Tight Houses Under IRC 2024
When is mechanical ventilation required under IRC 2024?
N1103.6
-
Three Paths to IRC 2024 Energy Code Compliance
What are the three ways to comply with the IRC 2024 energy code?
N1101.13
-
Window U-Factor and SHGC Requirements Under IRC 2024
What U-factor do windows need to meet IRC 2024?
N1102.3
Have a code question about your project? Get personalized answers from our team — $9/mo.
Membership