§ Chapter 34 IRC 2018

General Electrical Requirements

7 entries from Chapter 34 of IRC 2018, organized by section number. Each entry covers what the code requires, why it exists, what inspectors look for, and common mistakes.

§ 01   Sections

All 7 entries.

Sorted by section number. Click any row for the full entry — answer, requirements, edition diff, related sections.

Electrical Wiring Work Usually Requires a Permit Under IRC 2018
E3401.1
Do I need a permit to add or replace electrical wiring in my house under IRC 2018?
→
Electrical Work Needs Rough and Final Inspection Under IRC 2018
E3401.2
When does electrical work need rough and final inspection under IRC 2018?
→
Electrical Equipment Must Be Listed and Labeled Under IRC 2018
E3403.1
What electrical equipment must be listed and labeled under IRC 2018?
→
Electrical Panels Need Working Space Clearance Under IRC 2018
E3405.2
How much working space is required in front of an electrical panel under IRC 2018?
→
Panels Need Dedicated Electrical Space Under IRC 2018
E3405.3
Can plumbing or ductwork run above an electrical panel under IRC 2018?
→
Panels Cannot Be Installed in Bathrooms or Clothes Closets Under IRC 2018
E3405.4
Can an electrical panel be installed in a bathroom or closet under IRC 2018?
→
Junction Boxes Must Stay Accessible Under IRC 2018
E3405.5
Can a junction box be buried behind drywall under IRC 2018?
→