§ Chapter 34 IRC 2018

General Electrical Requirements

7 entries from Chapter 34 of IRC 2018, organized by section number. Each entry covers what the code requires, why it exists, what inspectors look for, and common mistakes.

§ 01   Sections

All 7 entries.

Sorted by section number. Click any row for the full entry — answer, requirements, edition diff, related sections.

Electrical Wiring Work Usually Requires a Permit Under IRC 2018
E3401.1
Do I need a permit to add or replace electrical wiring in my house under IRC 2018?
Electrical Work Needs Rough and Final Inspection Under IRC 2018
E3401.2
When does electrical work need rough and final inspection under IRC 2018?
Electrical Equipment Must Be Listed and Labeled Under IRC 2018
E3403.1
What electrical equipment must be listed and labeled under IRC 2018?
Electrical Panels Need Working Space Clearance Under IRC 2018
E3405.2
How much working space is required in front of an electrical panel under IRC 2018?
Panels Need Dedicated Electrical Space Under IRC 2018
E3405.3
Can plumbing or ductwork run above an electrical panel under IRC 2018?
Panels Cannot Be Installed in Bathrooms or Clothes Closets Under IRC 2018
E3405.4
Can an electrical panel be installed in a bathroom or closet under IRC 2018?
Junction Boxes Must Stay Accessible Under IRC 2018
E3405.5
Can a junction box be buried behind drywall under IRC 2018?