City Building Permits

Blaine, WA Building Permit Guide

How to apply for a building permit in Blaine, Washington. Permit authority, application steps, fees, and inspection requirements.

Washington Whatcom County Updated March 2026

Permit Authority

All properties within the incorporated City of Blaine.

Department
Community Development Services (CDS)
Address
435 Martin St, Suite 3000, Blaine, WA 98230
Phone
(360) 332-8311

Online Permit Portal

Platform: In-person / Digital / Mail submission • Account required: No • Submission: In-person only

Application Process

  1. Obtain building permit application and required forms from Community Development Services.
  2. Complete application and prepare site plans and blueprints (not applicable for fencing permits).
  3. Provide scaled site plan showing existing and proposed buildings with property line distances.
  4. Submit application in person, by digital submission, or by mail.
  5. Application is reviewed as Type I (administrative), Type II (quasi-judicial), or Type III (legislative) depending on project type.
  6. Address any requested corrections or conditions.
  7. Obtain permit approval and proceed with construction.

Typical processing time: Varies by review type; contact CDS for estimate

Source: Community Development Services (CDS)

General Requirements

A building permit is required for most construction within the City of Blaine.

Required Documents

  • Completed building permit application
  • Site plans
  • Blueprints (not applicable for fencing permits)
  • Scaled site plan showing existing and proposed buildings with property line distances
Permit validity
Contact CDS for permit validity terms.
Building code
International Building Code, International Residential Code, International Mechanical Code, International Fire Code, Uniform Plumbing Code, International Fuel Gas Code, International Existing Building Code, Washington State Energy Code
Contractor requirements
Washington State L&I contractor registration required. Business license verification may be required.

Fees

Minimum permit fee
Contact Community Development Services
Permit fee formula
Based on construction value (contact department for schedule)
Payment note
Fee structure established by City of Blaine resolution in uniform fee schedule. Contact CDS at (360) 332-8311 for current rates.

Work That Does NOT Require a Permit

Contact the Community Development Services (CDS) to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • (360) 332-8311 (phone)
Inspection hours
Monday-Friday 8:30 AM to 4:30 PM

Typical inspection sequence: Inspections conducted by Building Official and Fire Marshal. Required inspections include: foundation, framing, rough mechanical/plumbing/electrical, fire alarm and sprinkler systems (separate permits), insulation, final building inspection, and final fire inspection.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Community Development Services (CDS) before applying.

Need help with your project?

Navigating permits in Blaine can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Whatcom County

View all Whatcom County jurisdictions →