City Building Permits
Marysville, WA Building Permit Guide
How to apply for a building permit in Marysville, Washington. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
All properties within the incorporated City of Marysville.
- Department
- Community Development Services
- Address
- 1049 State Avenue, Marysville, WA 98270
- Phone
- 360-363-8100
- ced@marysvillewa.gov
- Website
- https://www.marysvillewa.gov
Online Permit Portal
Platform: Marysville Online Permit System • Account required: Yes • Submission: Online only
Application Process
- Submit application through online portal or in-person.
- Pay plan review fee (65% of building permit fee) at submittal.
- Plan review process conducted by city staff.
- Pay remaining permit fees upon approval.
- Permit issued.
Typical processing time: Varies by project complexity and current workload.
Source: Community Development Services
General Requirements
A building permit is required for most construction in the City of Marysville.
Required Documents
- Completed permit application
- Plans and specifications
- Application checklists as required by project type
- Building code
- 2021 International Building Code (IBC) and International Residential Code (IRC) with Washington amendments and local amendments (effective March 15, 2024).
- Contractor requirements
- All contractors must be registered with Washington State L&I.
Fees
- Plan check fee
- 65% of building permit fee (paid at submittal)
- Permit fee formula
- Building valuation based on ICC Building Valuation Data (February 2023 issue with 1.03 annual cost modifier starting 2025). Single-wide mobile homes: 2 hour base fee; Double-wide: 3 hour base fee.
- Reinspection fee
- One hour of staff time
- Payment note
- State Building Code Council Surcharge: $6.50 per building permit, plus $2.00 each dwelling unit, $25.00 for commercial. Revision Fee: One hour of staff time. Refund: Up to 70% if no review or work done; written request within 90 days required. Investigation Fee: Charged when work started prior to permit issuance.
Work That Does NOT Require a Permit
- Work exempt per IBC/IRC Section 105 as amended
Important: See Marysville Municipal Code 16.04.010(3) for amended exemption list. Exemptions do not authorize work in violation of code.
Inspections
How to Schedule
- 360-363-8100 (phone)
Typical inspection sequence: Inspections required throughout construction. Reinspection fees apply for failed inspections or work not ready.
Additional Resources
- Building code: 2021 International Building Code (IBC) and International Residential Code (IRC) with Washington amendments and local amendments (effective March 15, 2024).
- Verify contractor license: WA L&I Contractor Lookup
- Fee Schedule
- Business Licensing - WA State Department of Revenue
- License lookup guide: Washington Contractor License Requirements
- Contract template: Washington Homeowner-Contractor Agreement
- Washington hub: Washington Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Community Development Services before applying.
Need help with your project?
Navigating permits in Marysville can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Snohomish County
View all Snohomish County jurisdictions →