City Building Permits

North Bonneville, WA Building Permit Guide

How to apply for a building permit in North Bonneville, Washington. Permit authority, application steps, fees, and inspection requirements.

Washington Skamania County Updated March 2026

Permit Authority

All properties within the incorporated City of North Bonneville. Note: Most of North Bonneville lies within the Columbia River Gorge National Scenic Area (NSA).

Department
City of North Bonneville — City Hall
Address
214 CBD Mall Drive, North Bonneville, WA 98639
Phone
(509) 427-8182

Online Permit Portal

Platform: Cloudpermit / Paper Form (split approach) • Account required: Yes • Submission: In-person only

Application Process

  1. For general building permits (new construction, additions, structural remodels): Download the City Building Permit Application form from https://northbonneville.net/government/forms-permits/.
  2. Complete the application with project description, property information, and valuation.
  3. Prepare required documents including site plan, floor plans, and construction drawings.
  4. Check NSA overlay status — if the property is within the Columbia River Gorge National Scenic Area (which covers most of North Bonneville), confirm whether an NSA land use review is required before submitting the building permit application.
  5. Submit the completed application to City Hall in person or by mail.
  6. Pay fees as directed by City Hall.
  7. Permit issued once review is complete.
  8. For roofing, mechanical, and plumbing permits: Register at https://us.cloudpermit.com/registration and submit through the Skamania County Cloudpermit system.
  9. Schedule inspections by contacting City Hall or the county building division.

Typical processing time: Unknown; contact City Hall at (509) 427-8182 for current guidance. NSA review can take 3–9 months depending on project scope.

Source: City of North Bonneville — City Hall

General Requirements

A building permit is required for all new construction, structural alterations, additions, roofing, plumbing, and mechanical work within the City of North Bonneville. Electrical work is separately permitted through Washington State L&I. National Scenic Area overlay: virtually all land within North Bonneville lies within the Columbia River Gorge National Scenic Area. Most new land uses and ground-disturbing activities in the NSA require NSA land use approval from Skamania County's Planning Division before a building permit can be issued.

Required Documents

  • Site plan
  • Floor plans and construction drawings
  • Project description and valuation estimate
  • NSA approval documentation (if applicable)
Permit validity
Work must begin within 180 days of permit issuance; first inspection must occur within 180 days. No more than 180 days may elapse between any two consecutive inspections.
Building code
City has adopted the state building codes per RCW 19.27: International Building Code (IBC), International Residential Code (IRC), International Mechanical Code (IMC), Uniform Plumbing Code (UPC), International Fire Code (IFC), and Washington State Energy Code (WSEC). 2021 editions with Washington State amendments (effective March 15, 2024). Municipal code: Title 17 (last updated Ordinance 1159, 05/14/2024).
Owner-builder
Permit applications may be submitted by the property owner or a contractor registered with Washington State L&I.
Contractor requirements
All contractors must be registered with Washington State L&I. Contractor registration is separate from local permit requirements.

Fees

Permit fee formula
North Bonneville's building permit fees are not published online. For roofing, mechanical, and plumbing permits processed through Skamania County's Cloudpermit system, fees follow the Skamania County fee methodology (valuation-based, ICC Building Valuation Data, plus 65% plan review fee).
Payment note
Contact City Hall at (509) 427-8182 or info@northbonneville.net for current fee information.

Work That Does NOT Require a Permit

  • One-story detached accessory structures under 200 sq ft with no plumbing
  • Fences not over 6 feet in height
  • Retaining walls not over 4 feet in height (no surcharge)
  • Platforms and decks not more than 30 inches above grade
  • Finish work: painting, papering, tiling, carpeting, cabinets, countertops

Important: Within the NSA, exemptions from a building permit do not exempt work from NSA scenic review or Shoreline Master Program compliance. Confirm exemption applicability with City Hall before proceeding.

Inspections

How to Schedule

Inspection hours
City Hall: 8:00 AM – 5:00 PM, Monday – Friday

Typical inspection sequence: Standard inspection stages (footing, framing, rough-in, insulation, final) apply per the adopted IBC/IRC. Building inspections for general permits are coordinated through City Hall. Inspections for roofing, mechanical, and plumbing permits processed through Cloudpermit are handled by the Skamania County Building Division.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of North Bonneville — City Hall before applying.

Need help with your project?

Navigating permits in North Bonneville can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Skamania County

View all Skamania County jurisdictions →