City Building Permits

Puyallup, WA Building Permit Guide

How to apply for a building permit in Puyallup, Washington. Permit authority, application steps, fees, and inspection requirements.

Washington Pierce County Updated March 2026

Permit Authority

All properties within the incorporated City of Puyallup.

Department
Development and Permitting Services (DPS)

Online Permit Portal

Platform: CityView • Account required: Yes • Submission: Online only

Application Process

  1. Determine permit requirements based on project scope.
  2. Prepare plans, documentation, and site plan review materials.
  3. Submit application and complete package online through CityView portal.
  4. Pay plan review fees (due at time of submittal for complete packages).
  5. Plan review process by DPS staff.
  6. Pay building permit fees (due prior to issuance).
  7. Schedule inspections as required.

Typical processing time: Processing time varies by project complexity and plan review requirements.

Source: Development and Permitting Services (DPS)

General Requirements

A building permit is required for construction and major alterations within the City of Puyallup.

Required Documents

  • Completed permit application
  • Site plan review materials
  • Construction plans and drawings
  • SEPA checklist (if required)
  • Critical area review documentation (if required)
Permit validity
Building permits are valid for 180 days from issuance unless extended.
Building code
2021 Washington State Building Code with amendments (IBC/IRC).
Owner-builder
Homeowners may act as owner-builders; confirm requirements with DPS.
Contractor requirements
All contractors must be registered with Washington State L&I. Plan review fees due at time of submittal. Site plan review required for most projects. SEPA checklist may be required. Critical area review may be required for environmentally sensitive areas.

Fees

Minimum permit fee
$25
Plan check fee
65% of building permit fee
Permit fee formula
Based on valuation: $1-$500 = $25; $501-$2,000 = $25 + $3.05 per $100 over $500; continues in graduated brackets to $1,000,001+ = $5,608.75 + $3.65 per $1,000 over $1,000,000
Trade permit fee
See trade-specific fee schedule (mechanical, plumbing)
Reinspection fee
$63/hour
Payment note
Fees paid through CityView portal or in person.

Work That Does NOT Require a Permit

Contact the Development and Permitting Services (DPS) to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • CityView portal (online)
Scheduling deadline
Contact DPS for current scheduling deadlines.
Inspection hours
Monday-Friday during business hours (confirm with city)
Time windows
Inspection windows vary by project phase.

Typical inspection sequence: Inspections required at various construction phases.

Contact city for remote inspection options.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Development and Permitting Services (DPS) before applying.

Need help with your project?

Navigating permits in Puyallup can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Pierce County

View all Pierce County jurisdictions →