City Building Permits
Town of Eatonville, WA Building Permit Guide
How to apply for a building permit in Town of Eatonville, Washington. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
All properties within the Town of Eatonville.
- Department
- Building Department
- Address
- 201 Center St W, Eatonville, WA 98328
- Website
- https://www.eatonville-wa.gov/
Online Permit Portal
Platform: • Account required: No • Submission: In-person only
Application Process
- Contact Building Department for permit applications and requirements.
- Submit PDF application to planningadmin@eatonville-wa.gov
- Include complete documentation.
- Pay fees as determined.
- Schedule inspections as required.
Typical processing time: Processing time varies by project complexity.
Source: Building Department
General Requirements
A building permit is required for construction, enlargement, alteration, repair, moving, and demolition of buildings; and for changes to electrical, gas, mechanical, or plumbing systems.
Required Documents
- Completed permit application (PDF format)
- Construction plans and drawings
- Site plan
- Permit validity
- Building permits are valid for 180 days from issuance unless extended.
- Building code
- 2021 Washington State Building Code with amendments.
- Owner-builder
- Homeowners may act as owner-builders; confirm requirements with Building Department.
- Contractor requirements
- All contractors must be registered with Washington State L&I. Why permits are important: Protects property values, makes selling property easier (disclosure requirements), reduces hazards of unsafe construction, required by Town ordinance. Work without permit subject to fines, removal, or costly repairs.
Fees
- Minimum permit fee
- $50
- Plan check fee
- Included in permit fee components
- Permit fee formula
- Residential: $50.00 minimum plus fee per valuation. Commercial: $50.00 minimum plus $6.00 per $1,000 of contract valuation.
- Payment note
- Contact Building Department for payment methods.
Work That Does NOT Require a Permit
Contact the Building Department to confirm whether your project requires a permit before starting work.
Inspections
How to Schedule
- Building Department (phone)
- Scheduling deadline
- Contact Building Department for scheduling details.
- Inspection hours
- Monday-Friday: 8:30 AM - 5:00 PM (Closed 12:00 PM - 12:30 PM for lunch)
- Time windows
- Inspection windows vary by project phase.
Typical inspection sequence: Inspections required throughout construction process. Final inspection required.
Contact Building Department for remote inspection options.
Additional Resources
- Building code: 2021 Washington State Building Code with amendments.
- Verify contractor license: WA L&I Contractor Lookup
- Town Council Meetings (Second and fourth Mondays, 7:00 PM)
- Town Hall Services (Utilities, Pet Licensing, Passports, Building Permits, Police)
- License lookup guide: Washington Contractor License Requirements
- Contract template: Washington Homeowner-Contractor Agreement
- Washington hub: Washington Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Department before applying.
Need help with your project?
Navigating permits in Town of Eatonville can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Pierce County
View all Pierce County jurisdictions →