City Building Permits
Town of Creston, WA Building Permit Guide
How to apply for a building permit in Town of Creston, Washington. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
All properties within the incorporated Town of Creston.
- Department
- Town Hall (Building services coordinated with Lincoln County Building Division)
- Address
- SE 100 Creston Ave, P.O. Box 131, Creston, WA 99117
- Phone
- 509-636-3145
Online Permit Portal
Platform: Paper-based / Accela Online Portal • Account required: No • Submission: In-person only
Additional resources:
Application Process
- Contact Creston Town Hall at 509-636-3145 or townofcreston@centurytel.net to confirm current permit procedures and local sign-off requirements.
- Obtain the Lincoln County Building Permit Application form from the county website (lincolncountywa.com).
- Confirm the correct tax location code with town hall (likely County/2200 for unincorporated or a Creston-specific code).
- Prepare all required documents (site plan, construction plans, contractor license copy).
- Submit completed application to town hall for local sign-off by a town representative.
- Once town sign-off is obtained, submit to Lincoln County Building Division for plan review and permitting.
- Pay applicable permit fees.
- Receive permit and post at job site before work begins.
- Schedule inspections directly with Lincoln County Building Inspector Ryan James at 509-721-0539.
Typical processing time: Processing time varies. Creston is a very small town (approximately 200 residents) with minimal building department documentation. Confirm specific timelines with town hall directly.
Source: Town Hall (Building services coordinated with Lincoln County Building Division)
General Requirements
Washington State Building Code (RCW 19.27) applies as the minimum standard. Permits are required for new construction, additions, alterations, remodels, and demolitions of any residential, commercial, or industrial building.
Required Documents
- Completed Lincoln County Building Permit Application
- Site plan showing property boundaries and structure location
- Construction plans for structural work
- Contractor Washington State license copy (if using a contractor)
- Permit validity
- Must commence construction within 180 days of permit issuance or permit becomes void. Permit valid for 18 months from issuance; renewable for 6 months if substantial progress is demonstrated.
- Building code
- 2021 International Building Code (IBC) and 2021 International Residential Code (IRC) with Washington State amendments, effective March 15, 2024
- Contractor requirements
- All contractors must hold a current Washington State contractor registration. Bond requirements: $30,000 (general contractors) or $15,000 (specialty contractors) as of July 2024.
Fees
- Permit fee formula
- Follows Washington State Building Code fee table structure (RCW 19.27.085) plus state surcharge of $6.50 per permit plus $2.00 per $1,000 of construction valuation
- Payment note
- No published fee schedule found. Fees are likely set by town council resolution or follow the Lincoln County Building Division schedule. Contact town hall at 509-636-3145 for current fees.
Work That Does NOT Require a Permit
- One-story detached accessory structures with roof projection not exceeding 120 sq ft
- Retaining walls 4 feet or less in height (measured from footing bottom to top of wall)
- Normal maintenance and repairs (painting, wallpapering, adding insulation without structural change)
- Temporary horticultural growing structures used solely for commercial production
Important: Exemption from building permit does not mean exemption from code compliance. Electrical work is never exempt and requires L&I permitting. Confirm any local exemptions with town hall.
Inspections
How to Schedule
- Lincoln County Building Inspector Ryan James: 509-721-0539 (phone)
- Lincoln County Building Division: building@co.lincoln.wa.us (email)
- Creston Town Hall: 509-636-3145 (phone)
- Scheduling deadline
- Provide at least 2 business days advance notice for inspection requests.
- Inspection hours
- Town Hall: Monday-Thursday, 6:00 AM-4:00 PM (subject to change; verify before visiting)
Typical inspection sequence: Inspection stages likely follow Lincoln County standards: footings, foundation, framing, insulation, final. Contact the Building Inspector or town hall to confirm specific inspection sequence for your project.
Additional Resources
- Building code: 2021 International Building Code (IBC) and 2021 International Residential Code (IRC) with Washington State amendments, effective March 15, 2024
- Verify contractor license: WA L&I Contractor Lookup
- Lincoln County Building Division
- Lincoln County Online Permits (Accela)
- L&I Electrical Permits
- License lookup guide: Washington Contractor License Requirements
- Contract template: Washington Homeowner-Contractor Agreement
- Washington hub: Washington Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Town Hall (Building services coordinated with Lincoln County Building Division) before applying.
Need help with your project?
Navigating permits in Town of Creston can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Lincoln County
View all Lincoln County jurisdictions →