City Building Permits
Town of Westport, WA Building Permit Guide
How to apply for a building permit in Town of Westport, Washington. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
All properties within the incorporated Town of Westport.
- Department
- Building Department
- Address
- PO Box 505, 801 N. Montesano St., Westport, WA 98595
- Phone
- (360) 268-1999
Online Permit Portal
Platform: In-Person/Email • Account required: No • Submission: In-person only
Additional resources:
Application Process
- Obtain application forms from Building Department
- Complete application with required information
- Submit site plan and construction documents
- Pay fees based on fee schedule
- Schedule inspections as required
Source: Building Department
General Requirements
A building permit is required for all construction within the Town of Westport.
Required Documents
- Name and address of owner
- Legal description of property
- Name and address of designer
- Intended use of building
- Two complete sets of plans and specifications
- Plot plan showing location and dimensions of all buildings and improvements
- Setbacks, grades, easements, water courses
- Plans drawn to minimum scale of 1/4 inch to 1 foot
- Building code
- International Building Code (IBC), International Residential Code (IRC)
- Contractor requirements
- Washington State L&I registration required.
Fees
- Permit fee formula
- Established by Resolution of Town Board
Work That Does NOT Require a Permit
- Agricultural buildings without electrical or plumbing services (exempt from building permit but not from electrical/plumbing permits if services added)
- Repairs for maintenance not involving structural portions, room arrangement, light/ventilation, exits, fire protection, or exterior aesthetic appearance
- Minor repairs as determined by Building Inspector
- Fences 6 feet or under (over 6 feet requires building permit and engineering)
Important: Exempt from building permit does not mean exempt from other requirements.
Inspections
How to Schedule
Typical inspection sequence: Inspections required throughout construction. Certificate of Use and Occupancy required before occupying new buildings. Temporary certificates may be issued for portions that can be safely occupied.
Additional Resources
- Building code: International Building Code (IBC), International Residential Code (IRC)
- Verify contractor license: WA L&I Contractor Lookup
- Building Permit Application Form
- Residential Plan Review Checklist
- Commercial & Multi-Family Permit Submittal Checklist
- Critical Areas Checklist
- License lookup guide: Washington Contractor License Requirements
- Contract template: Washington Homeowner-Contractor Agreement
- Washington hub: Washington Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Department before applying.
Need help with your project?
Navigating permits in Town of Westport can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Grays Harbor County
View all Grays Harbor County jurisdictions →