City Building Permits

East Wenatchee, WA Building Permit Guide

How to apply for a building permit in East Wenatchee, Washington. Permit authority, application steps, fees, and inspection requirements.

Washington Douglas County Updated March 2026

Permit Authority

All properties within the incorporated City of East Wenatchee. Electrical permits are obtained from Washington State L&I, not the city.

Department
Building and Code Enforcement Division
Address
271 9th Street NE, East Wenatchee, WA 98802
Phone
(509) 884-5396

Online Permit Portal

Platform: Paper-based • Account required: No • Submission: In-person only

Application Process

  1. Download or request the appropriate application form from the city website or Building Division office.
  2. Prepare required documents: site plan, construction plans drawn to scale (floor plan, elevations, foundation plan, framing plan), and energy code compliance documentation.
  3. Submit in person at 271 9th Street NE during office hours (Monday-Friday, 8:00 AM to 5:00 PM).
  4. Building Division staff conducts plan review. Single-family residential review typically takes approximately four weeks after the application is deemed complete.
  5. Upon approval, pay fees and obtain permit issuance.
  6. Schedule inspections as required at each construction stage.

Typical processing time: Approximately four weeks for single-family residential plan review after application is deemed complete.

Source: Building and Code Enforcement Division

General Requirements

A building permit is required for any new construction, enlargement, alteration, repair, removal, conversion, or replacement of a building or structure. Installation of new gas, mechanical, or plumbing systems, and demolition of structures all require permits.

Required Documents

  • Completed Building Permit Application
  • Site plan showing property lines, setbacks, existing and proposed structures
  • Construction plans drawn to scale (floor plan, elevations, foundation plan, framing plan, structural details)
  • Energy code compliance documentation
  • Mechanical/Plumbing Application (if applicable, separate form)
Permit validity
Work must begin within 180 days of permit issuance.
Building code
2021 International Building Code (IBC), International Residential Code (IRC), International Mechanical Code (IMC), International Plumbing Code (IPC), and International Fire Code (IFC) with Washington State amendments, effective March 15, 2024.
Owner-builder
Property owners may perform their own work without contractor registration for personal-use projects (not for resale).
Contractor requirements
Contractors must be registered with Washington State L&I and in good standing. No permit may be issued for work by a third-party contractor unless the contractor is registered with L&I.

Fees

Plan check fee
Typically 65% of the building permit fee (confirm current rate with Building Division)
Permit fee formula
Based on 88% of the International Code Council (ICC) Square Foot Construction Costs table (valuation-based fee structure). Specific amounts are available in the city's 2025 fee schedule.
Trade permit fee
Single-Family Mechanical: $30; Single-Family Plumbing: $85
Payment note
All permit processing fees must be submitted as part of required application materials. Most fees are non-refundable, except where an application is formally withdrawn in writing before any required public notice is issued.

Fees change. Verify current amounts at the official fee schedule (effective January 1, 2025).

Work That Does NOT Require a Permit

  • One-story detached accessory structures used as tool/storage sheds, playhouses, or similar uses with a projected roof area not exceeding 200 sq ft, with no sleeping accommodations, no plumbing, and a 5-foot minimum separation from other structures and property lines

Important: Refer to the East Wenatchee Municipal Code or contact the Building Division for the current exemptions list. Even exempt work must comply with setback requirements, shoreline regulations, and other local ordinances.

Inspections

How to Schedule

  • (509) 884-5396 (phone)
  • planningstaff@eastwenatcheewa.gov (email)
Inspection hours
Monday-Friday, 8:00 AM to 5:00 PM

Typical inspection sequence: Typical inspection stages: Foundation/footing (before pour), Framing (before insulation or wallboard), Insulation, Plumbing rough-in, Mechanical rough-in, Final inspection (all work complete; required before occupancy).

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building and Code Enforcement Division before applying.

Need help with your project?

Navigating permits in East Wenatchee can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.