City Building Permits
Woodland, WA Building Permit Guide
How to apply for a building permit in Woodland, Washington. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
All properties within the incorporated City of Woodland (note: Woodland spans both Clark County and Cowlitz County; verify parcel location carefully).
- Department
- City of Woodland Community Development Department
- Address
- 230 Davidson, Woodland, WA
- Website
- https://www.ci.woodland.wa.us/
Online Permit Portal
Platform: CloudPermit • Account required: Yes • Submission: In-person only
Additional resources:
Application Process
- Submit application electronically to permitclerk@ci.woodland.wa.us or in person at 230 Davidson, Woodland, WA.
- Plan review by Building Division.
- Permit issuance.
- Schedule inspections (24 hours advance notice required).
General Requirements
A building permit is required for all construction work within the City of Woodland.
Required Documents
- Building plans conforming to adopted codes
- Site plan (may be required)
- Environmental checklist (required for structures over 4,000 sq ft)
- Building code
- 2015 International Residential Code (IRC) with Washington State Amendments, Washington State Energy Code (WSEC), International Building Code (as applicable), International Mechanical Code, Uniform Plumbing Code
- Contractor requirements
- All contractors must have WA State Business License. Electrical permits through L&I. NPDES General Construction Stormwater Permit required for land disturbing activities of 1 acre or more. Stormwater Pollution Prevention Plan (SWPPP) required. Underground Injection Control (UIC) Permit required for infiltration facilities. Certified Erosion and Sediment Control Lead (CESCL) required.
Fees
- Permit fee formula
- Based on project valuation; specific fee schedule available from city
Work That Does NOT Require a Permit
- Grading less than 50 cubic yards total (associated with building foundation, utilities, landscaping; no critical areas present; no soil compaction concerns)
- Fences 3 feet or less: No permit required
Important: Fences over 3 feet in height require a permit.
Inspections
How to Schedule
- CloudPermit (online)
- Call office (phone)
- Scheduling deadline
- Minimum 24 hours advance notice required
Typical inspection sequence: Final inspection required for ALL permit types (grading, mechanical, plumbing, re-roof, demolition, etc.). Progress inspections as applicable.
Additional Resources
- Building code: 2015 International Residential Code (IRC) with Washington State Amendments, Washington State Energy Code (WSEC), International Building Code (as applicable), International Mechanical Code, Uniform Plumbing Code
- Verify contractor license: WA L&I Contractor Lookup
- Public Works Department
- License lookup guide: Washington Contractor License Requirements
- Contract template: Washington Homeowner-Contractor Agreement
- Washington hub: Washington Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Woodland Community Development Department before applying.
Need help with your project?
Navigating permits in Woodland can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Clark County
View all Clark County jurisdictions →