Permit Authority

Pleasant View City limits only.

Department
Building
Address
520 W Elberta Dr, Pleasant View, UT 84414
Phone
801-782-8529

Online Permit Portal

Platform: CityInspect • Account required: Yes • Submission: Online only

Additional resources:

Application Process

  1. Complete the permit application and upload required attachments via CityInspect.
  2. Plans are submitted to the inspector for review.
  3. The review process averages 7 to 10 business days.
  4. The city processes permit amounts and CityInspect emails status updates.
  5. Pay fees and receive permit issuance.
  6. Schedule inspections through the CityInspect account.

Typical processing time: Average 7 to 10 business days.

Source: Building

General Requirements

Permits are needed when building something 200 square feet or more, when replacing electrical/plumbing/mechanical work that needs inspection, and when making structural changes to a home.

Required Documents

  • Permit-specific attachments uploaded in CityInspect
Permit validity
Work should start within 6 months; as long as inspections and work continue every 6 months, the permit stays open.
Building code
Pleasant View administers under Utah State Construction Code; local amendment details were not clearly stated on the reviewed pages.
Owner-builder
Not clearly stated on the reviewed public pages.
Contractor requirements
Utah licensing requirements apply.

Fees

Permit fee formula
Building fees are in the consolidated fee schedule; other city development fees and impact fees are separately listed.
Reinspection fee
$150.00
Penalty (no permit)
Investigation fee for work without a permit doubles the building fee.
Payment note
CityInspect is the primary electronic permit system; fee status updates are sent through the portal.

Fees change. Verify current amounts at the official fee schedule (effective July 8, 2025).

Work That Does NOT Require a Permit

  • Projects under 200 square feet may fall outside building permit requirements

Important: Applicants still need to verify setbacks and easements with the city.

Inspections

How to Schedule

  • CityInspect account (online)

Typical inspection sequence: Zoning, temporary power, setback, excavation/forms and footings, foundation reinforcing steel, sewer and water laterals, rough framing, rough mechanical, rough electrical, rough plumbing and test, insulation, exterior and service-related checks, final electrical, final plumbing, final mechanical, final construction.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building before applying.

Need help with your project?

Navigating permits in Pleasant View can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Weber County

View all Weber County jurisdictions →