City Building Permits
Centerville, UTAH Building Permit Guide
How to apply for a building permit in Centerville, Utah. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Covers properties inside Centerville City limits.
- Department
- Building & Safety Department
- Address
- 655 North 1250 West, Centerville, UT 84014
- Phone
- 801-292-8232
Online Permit Portal
Platform: • Account required: No • Submission: In-person only
Application Process
- Complete the applicable Centerville building permit application.
- Submit the application and project information to the Building & Safety Department at 655 North 1250 West.
- Provide contractor license information, or submit owner-builder certification if the owner is claiming exemption from contractor licensure.
- City reviews the submittal for completeness and code compliance.
- Pay required building fees.
- Request required inspections by phone with permit details.
Typical processing time: Older city performance data in archived budget material reported 3 to 5 days, but this is not a current service commitment.
Source: Building & Safety Department
General Requirements
Building permit application and commercial permit instruction forms indicate building permits are required for residential and commercial construction subject to city review.
Required Documents
- Application, contractor and contact information, and project-specific submittal documents
- Commercial instructions and checklists exist for commercial work
- Permit validity
- Not clearly posted on the public pages.
- Building code
- Statewide 2021 Utah construction code adoption applies unless local amendments control.
- Owner-builder
- Centerville's permit application includes owner-builder declaration language under the Utah Construction Trades Licensing Act.
- Contractor requirements
- Contractor names and Utah license numbers must be provided before work begins when the owner is not performing the work.
Fees
- Plan check fee
- Fee category exists in archive material; current detailed public schedule was not clearly located.
- Permit fee formula
- Budget archive shows separate building, plan check, electrical, plumbing, mechanical, and state surcharge fee categories, but not the detailed current fee table.
- Reinspection fee
- $66.66 per reinspection when work is incomplete or corrections have not been made.
- Payment note
- Verify current payment methods with Building & Safety because public portal/payment details were thin.
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
Contact the Building & Safety Department to confirm whether your project requires a permit before starting work.
Inspections
How to Schedule
- 1-800-560-6151 (phone)
- Inspection hours
- No inspections after 3:30 p.m.
Typical inspection sequence: Temporary power pedestal, permanent power, gas line, footing, foundation, electrical, mechanical, plumbing, land drain, pool rebar or bond beam, exterior shear wall, 4-way, insulation, shower pan, garage sheetrock if applicable, fire-rated walls, stucco lathe, weather barrier, fire sprinkler if applicable, and final.
Additional Resources
- Building code: Statewide 2021 Utah construction code adoption applies unless local amendments control.
- Verify contractor license: Utah DOPL License Lookup
- Zoning information: View zoning info
- Residential Building Permit
- Required Inspections
- Land Use Permits
- License lookup guide: Utah Contractor License Requirements
- Contract template: Utah Homeowner-Contractor Agreement
- Utah hub: Utah Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building & Safety Department before applying.