City Building Permits

Gladewater, TX Building Permit Guide

How to apply for a building permit in Gladewater, Texas. Permit authority, application steps, fees, and inspection requirements.

Texas Gregg County Updated March 2026

Permit Authority

All properties within the incorporated City of Gladewater. Gladewater extends into Upshur County; city permit authority applies to city-limit properties regardless of county.

Department
Building Inspector / Code Enforcement
Address
519 E Broadway Ave, Gladewater, TX 75647
Phone
903-845-2196

Online Permit Portal

Platform:Account required: No • Submission: In-person only

Application Process

  1. Start with the city's Forms & Permits page or contact City Hall.
  2. Confirm permit type and fee with the official fee schedule.
  3. Submit permit materials through the city's current filing method.
  4. Obtain required inspections and certificate of occupancy when applicable.

Source: Building Inspector / Code Enforcement

General Requirements

The city expressly states construction and permitting must comply with local requirements, and its fee schedule includes building permits, accessory-building permits, demolition, driveway approach, electrical, HVAC/mechanical, plumbing/gas, fire systems, signs, pools, and certificates of occupancy.

Required Documents

  • Completed permit application
  • Construction plans as required
Building code
2012 International Building Code
Contractor requirements
Local registration required at $30.00 per permit.

Fees

Minimum permit fee
$50.00
Permit fee formula
Building permit fee is $0.25 per square foot
Reinspection fee
$25.00
Payment note
Accessory buildings $50, demolition $50, driveway approach $35, electrical $50, HVAC/mechanical $50, plumbing/gas $50, commercial certificate of occupancy $75, residential certificate of occupancy $25, above-ground pool $75, in-ground pool $200, local registration $30.00 per permit.

Fees change. Verify current amounts at the official fee schedule.

Work That Does NOT Require a Permit

Contact the Building Inspector / Code Enforcement to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • City Hall: 903-845-2196 (phone)

Typical inspection sequence: Permit application, any plan review if applicable, field inspections, then certificate of occupancy where applicable.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Inspector / Code Enforcement before applying.

Need help with your project?

Navigating permits in Gladewater can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Gregg County

View all Gregg County jurisdictions →