City Building Permits

Whitewright, TX Building Permit Guide

How to apply for a building permit in Whitewright, Texas. Permit authority, application steps, fees, and inspection requirements.

Texas Grayson County Updated March 2026

Permit Authority

Whitewright has an active permit office with residential and commercial permit packets, contractor registration, Bureau Veritas inspections, and published building-code requirements.

Department
Permits
Address
206 W Grand St., Whitewright, TX 75491
Phone
(903) 364-2219

Online Permit Portal

Platform:Account required: No • Submission: In-person only

Application Process

  1. Use the city's residential or commercial permit application packet.
  2. Submit completed application, site plans, full construction documents, foundation information, energy documents, and other required submittals to the city.
  3. Ensure all contractors are registered with the city.
  4. Request inspections through Bureau Veritas.
  5. Pass the building final inspection before occupancy.

Source: Permits

General Requirements

Whitewright requires that all new construction, alterations, or additions require a building permit. The city specifically lists concrete drives/walks, drainage and storm sewer, moved-in preassembled buildings over 300 square feet, and any building with structural, plumbing, electrical, or mechanical work.

Required Documents

  • Detailed site plans
  • Floor plans
  • Elevations
  • Structural plans (where required)
  • Engineer-sealed foundation materials (where applicable)
  • Electrical and plumbing layouts
  • Energy compliance documentation
Building code
2018 IBC, 2018 IRC, 2018 IFC, 2018 IFGC, 2018 IPC, 2018 IMC, 2020 NEC, 2018 IECC, Whitewright zoning ordinance, and local amendments.
Contractor requirements
All contractors performing work within Whitewright's jurisdiction must be registered with the city.

Fees

Payment note
Confirm current fee schedule directly with Whitewright permits.

Work That Does NOT Require a Permit

Contact the Permits to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • Bureau Veritas (phone)
  • Bureau Veritas (email)
Scheduling deadline
Inspections requested by 4:00 p.m. Monday through Friday are performed the next business day.

Typical inspection sequence: Staged inspections including plumbing rough, water service, yard sewer, form survey, foundation, electric rough, mechanical rough, gas rough piping/test, plumbing top-out, frame, energy insulation, construction electric and gas final, electrical final, mechanical final, plumbing final, energy final, customer service inspection form, final grade survey, fence final, and building final.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Permits before applying.

Need help with your project?

Navigating permits in Whitewright can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.