City Building Permits

Manheim Township, PENNSYLVANIA Building Permit Guide

How to apply for a building permit in Manheim Township, Pennsylvania. Permit authority, application steps, fees, and inspection requirements.

Pennsylvania Lancaster County Updated March 2026

Permit Authority

Township runs separate zoning and code compliance workflows; zoning permits can be submitted online and building permits are still described as in-person or first-class mail submissions on the public permit instructions page.

Department
Code Compliance Department for building permits; Planning & Zoning Department for zoning permits
Address
1840 Municipal Drive, Lancaster, PA 17601
Phone
717-569-6408 main township line; inspection and permit instructions direct applicants to 717-569-6406 ext. 6 for many code inspections

Online Permit Portal

Platform: CityView Permit Portal • Account required: Yes • Submission: In-person only

Additional resources:

Application Process

  1. Determine whether the project needs zoning only, or both zoning and building/code review.
  2. Submit the zoning permit packet or online zoning application with site plan and required stormwater exemption form if applicable.
  3. For building permits, submit a completed application, fee worksheet, two plan sets, and two site plans to Code Compliance.
  4. Await township review in order of submittal and respond to comments.
  5. Pay fees and receive the issued permit.
  6. Call the township or the approved third-party agency listed by the township for required inspections and final approvals.

Typical processing time: Township goal is 10 business days for residential building permits and 25 business days for non-residential projects; zoning review time varies seasonally and is handled in order of submittal.

Source: Code Compliance Department for building permits; Planning & Zoning Department for zoning permits

General Requirements

Zoning permits are required for covered new construction and site changes; building, electrical, plumbing, mechanical, fire, pool/hot tub, and certificate of use and occupancy permits are handled by Code Compliance.

Required Documents

  • Application
  • Fee worksheet
  • Two copies of plans and specifications
  • Two copies of site plan
  • Other zoning or stormwater documentation as applicable
Building code
Pennsylvania UCC administered locally by Manheim Township
Owner-builder
Permit applications may be submitted by owners or authorized applicants; no separate township owner-builder summary page was located.
Contractor requirements
Pennsylvania home improvement registration rules apply where required; township also publishes contractor-related registration forms for some specialty work.

Fees

Plan check fee
Included in the township permit fee schedule and worksheets.
Permit fee formula
Residential and non-residential fee worksheets are required with applications; exact formula is on the linked permit fee schedule and worksheets.
Reinspection fee
Included in the township permit fee schedule.
Payment note
Over-the-counter permits require applicable fee at submission; other fees are paid during permit processing.

Fees change. Verify current amounts at the official fee schedule.

Work That Does NOT Require a Permit

  • Small sheds and outbuildings up to 400 square feet
  • Low decks 30 inches or less above grade
  • Patios
  • Paved terraces
  • Fences
  • Some driveway reconstruction or expansion
  • Sidewalks or walkways outside the road right-of-way

Important: Township states zoning permits are required for all new construction not requiring a building permit. Confirm any claimed exemption directly with Planning & Zoning or Code Compliance because the public page is a permit-routing guide, not a full exemption ordinance digest.

Inspections

How to Schedule

  • 717-569-6406 ext. 6 for many residential electrical, plumbing/mechanical, and occupancy inspections (phone)
  • Some non-residential electrical inspections are through approved third-party electrical inspection agencies (other)
Inspection hours
Monday through Friday, 7:30 a.m. to 4:30 p.m.

Typical inspection sequence: Rough inspections, trade inspections, certificate of use and occupancy inspection where applicable, and final inspection.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Code Compliance Department for building permits; Planning & Zoning Department for zoning permits before applying.

Need help with your project?

Navigating permits in Manheim Township can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Lancaster County

View all Lancaster County jurisdictions →