College Township, PENNSYLVANIA Building Permit Guide
How to apply for a building permit in College Township, Pennsylvania. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Most construction requires College Township zoning approval before going to CRCA; the township checklist notes some interior single-family residential work may qualify for a zoning waiver.
- Department
- College Township Planning and Zoning Department (zoning permits); Centre Region Code Administration (building permits)
- Address
- College Township: 1481 E. College Avenue, State College, PA 16801; CRCA: 2643 Gateway Drive, Suite 1, State College, PA 16801
- Phone
- Township: 814-231-3021; CRCA: 814-231-3056
Online Permit Portal
Platform: Township forms, checklists, and Document Center plus CRCA forms • Account required: No • Submission: In-person only
Additional resources:
Application Process
- Determine whether a zoning permit or zoning waiver is needed; the township checklist says most construction requires zoning review before going to CRCA.
- Prepare the completed building permit application, impervious coverage sheet, site plan, construction drawings, and any utility or erosion-related approvals required by the checklist.
- Submit the township zoning application and fee.
- The zoning officer approves or denies a complete application within 30 days, or within 60 days where residential site plan review is required.
- After township zoning approval, submit or continue with the CRCA building permit application for UCC review.
- Obtain final township inspection before the zoning permit expires, and complete CRCA inspections as required.
Typical processing time: 30 days from receipt of a full and complete zoning application, or 60 days when residential site plan review is required
General Requirements
Most construction requires a township zoning permit before CRCA review; normal maintenance such as painting and minor repairs does not require a zoning permit
Required Documents
- Completed application
- Zoning fee
- Impervious coverage sheet
- Site plan
- Two copies of construction drawings for zoning review
- Utility approvals if needed
- Erosion plan sheet if required
- Permit validity
- A completed project must be inspected by the township before the expiration date stated on the zoning permit
- Building code
- Pennsylvania Uniform Construction Code enforced by CRCA
- Owner-builder
- Township checklist notes some interior work in a non-rental, non-home-occupation single-family residence may qualify for a zoning waiver; no broader owner-builder rule was posted
- Contractor requirements
- Pennsylvania HICPA registration applies where required; CRCA workers compensation documentation applies on building permits
Fees
- Minimum permit fee
- Township zoning permit minimum $35.00; CRCA building permit minimum $55.50
- Plan check fee
- Township resubmission of site plans prior to a zoning permit is $30.00; CRCA additional plan review after the second review is $130.00 per hour
- Permit fee formula
- Township zoning permit fee is estimated construction cost times 0.001 up to $1,000,000 and 0.0005 over that amount, with a $35.00 minimum
- Reinspection fee
- Township zoning hearing application fee is $200 plus $1,000 escrow; CRCA reinspection charges apply by fee schedule
- Payment note
- Township checklist says permit and application fees are due on submission and payable to College Township
Fees change. Verify current amounts at the official fee schedule (effective 2023).
Work That Does NOT Require a Permit
Contact the College Township Planning and Zoning Department (zoning permits); Centre Region Code Administration (building permits) to confirm whether your project requires a permit before starting work.
Inspections
How to Schedule
- Township office or CRCA (in-person)
- Inspection hours
- Township hours Monday through Friday, 8:00 AM to 5:00 PM; CRCA hours Monday through Friday, 8:00 AM to 12:00 PM and 1:00 PM to 5:00 PM
Typical inspection sequence: Township zoning review, CRCA permit review and issuance, trade or phase inspections, then township final zoning inspection if applicable
Additional Resources
- Building code: Pennsylvania Uniform Construction Code enforced by CRCA
- Zoning information: View zoning info
- Building Permit Checklist
- Zoning Change & Use Verification
- CRCA Building Permits
- License lookup guide: Pennsylvania Contractor License Requirements
- Contract template: Pennsylvania Homeowner-Contractor Agreement
- Pennsylvania hub: Pennsylvania Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the College Township Planning and Zoning Department (zoning permits); Centre Region Code Administration (building permits) before applying.
Need help with your project?
Navigating permits in College Township can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Centre County
View all Centre County jurisdictions →