Town of Brighton, NY - Building Permit Guide

How to apply for a building permit in Town of Brighton, New York. Permit authority, application steps, fees, and inspection requirements.

New York Franklin County Updated March 2026

Permit Authority

All properties within the Town of Brighton outside incorporated village limits.

Department
Code Enforcement Officer
Address
PO Box 260, Paul Smiths, NY 12970
Phone
518-327-3202

Online Permit Portal

Platform: Town Code Officer Office • Account required: No • Submission: In-person only

Application Process

  1. Obtain building permit application from the town office or website.
  2. Prepare construction plans and site plan per code requirements.
  3. If in Adirondack Park, obtain APA determination before town filing.
  4. Submit completed application and documents to Code Officer.
  5. Code Officer reviews for completeness and compliance.
  6. Pay permit fee.
  7. Receive permit and schedule required inspections.
  8. Pass inspections before project completion.

Typical processing time: Typically 1-3 weeks for initial review after submission.

Source: Code Enforcement Officer

General Requirements

Building permits are required for work that must conform to the Uniform Code or Energy Code, including construction, enlargement, alteration, improvement, relocation, demolition, and solid-fuel appliance work.

Required Documents

  • Completed permit application
  • Site plan
  • Construction plans
  • Applicant information
  • APA determination (if in Adirondack Park)
Permit validity
Varies; contact Code Officer for details.
Building code
New York State Uniform Fire Prevention and Building Code; New York State Energy Conservation Construction Code
Owner-builder
Verify owner-builder regulations with the Code Officer before proceeding.
Contractor requirements
Contractors must hold valid licenses and insurance as required by New York State.

Fees

Minimum permit fee
Contact Code Officer
Plan check fee
Contact Code Officer
Permit fee formula
Contact Code Officer for fee structure
Trade permit fee
Contact Code Officer
Reinspection fee
Contact Code Officer
Penalty (no permit)
Contact Code Officer
Payment note
Contact Code Officer for payment methods and options.

Work That Does NOT Require a Permit

  • Detached accessory structures up to 144 square feet

Important: Exemptions follow New York State baseline and may vary. Contact Code Officer to confirm.

Inspections

How to Schedule

  • 518-327-3202 (phone)
Scheduling deadline
Contact Code Officer for scheduling deadlines.
Inspection hours
Contact Code Officer for office hours.
Time windows
Contact Code Officer for inspection windows.

Typical inspection sequence: Contact Code Officer for inspection sequence requirements.

Contact Code Officer regarding remote inspection options.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Code Enforcement Officer before applying.

Frequently Asked Questions

Town of Brighton Building Permit FAQ

Do I need a building permit in Town of Brighton, NY?
Building permits are required for work that must conform to the Uniform Code or Energy Code, including construction, enlargement, alteration, improvement, relocation, demolition, and solid-fuel appliance work.
How much does a building permit cost in Town of Brighton, NY?
The minimum permit fee is Contact Code Officer. Fees are calculated as: Contact Code Officer for fee structure. Plan check fee: Contact Code Officer.
How do I apply for a building permit in Town of Brighton, NY?
1. Obtain building permit application from the town office or website. 2. Prepare construction plans and site plan per code requirements. 3. If in Adirondack Park, obtain APA determination before town filing. 4. Submit completed application and documents to Code Officer. 5. Code Officer reviews for completeness and compliance. 6. Pay permit fee. 7. Receive permit and schedule required inspections. 8. Pass inspections before project completion.
How long does it take to get a building permit in Town of Brighton, NY?
Typical processing time is Typically 1-3 weeks for initial review after submission..
What work is exempt from building permits in Town of Brighton, NY?
The following work is generally exempt: Detached accessory structures up to 144 square feet. Note: Exemptions follow New York State baseline and may vary. Contact Code Officer to confirm.
How do I schedule a building inspection in Town of Brighton, NY?
Inspections can be scheduled via: 518-327-3202. Contact Code Officer for scheduling deadlines..

Need help with your project?

Navigating permits in Town of Brighton can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.