City Building Permits

Wells, NV Building Permit Guide

How to apply for a building permit in Wells, Nevada. Permit authority, application steps, fees, and inspection requirements.

Nevada Elko County Updated March 2026

Permit Authority

City limits of Wells

Department
City of Wells Building and Safety Division
Address
525 Sixth Street, PO Box 366, Wells, NV 89835
Phone
(775) 752-3355

Online Permit Portal

Platform:Account required: No • Submission: In-person only

Application Process

  1. Obtain and complete Building Permit Application
  2. Prepare two identical sets of construction plans
  3. Submit application and plans with required fees
  4. Plan review by building official
  5. Approved plans marked APPROVED and returned to applicant
  6. Schedule required inspections (48 hours advance notice required)
  7. Final inspection

Typical processing time: Varies by project; 180-day expiration from application if no permit issued

Source: City of Wells Building and Safety Division

General Requirements

New construction, additions, remodels, repairs, electrical, plumbing, mechanical work

Required Documents

  • Completed application
  • Plot plan
  • Site plan
  • Floor plan
  • Footing plan
  • Cross-sections
  • Framing plan
  • Plumbing
  • Mechanical
  • Electrical
  • Elevations
Permit validity
180 days from permit issuance; work must commence within 180 days or permit becomes null and void; abandonment for 180 days voids permit
Building code
2012 International Residential Code (Chapters 12-43, R313 deleted), 2012 International Building Code, 2012 International Fire Code, 2012 Uniform Mechanical Code, 2012 Uniform Plumbing Code, 2011 National Electrical Code, 2012 International Energy Code, 2012 International Existing Building Code
Owner-builder
Owner-builders may prepare and submit own plans for own private residential use. Plans must be titled without reference to being prepared by another party and have original signature. Wet stamped with original signature required.
Contractor requirements
Nevada State Contractors Board license required for all contractors; license numbers must be provided on application

Fees

Plan check fee
Included in permit fee
Permit fee formula
Based on project valuation and type
Reinspection fee
May apply; contact City Hall for rates
Payment note
Contact department for accepted payment methods

Work That Does NOT Require a Permit

  • Fences in agricultural zones (limited exemption)

Important: All construction work must comply with adopted codes even if exempt from permit.

Inspections

How to Schedule

  • (775) 752-3355 (phone)
Scheduling deadline
By 4:00 PM, 48 hours in advance
Inspection hours
Following 2 working days between 8:00 AM - 5:00 PM

Typical inspection sequence: Typical sequence: Foundation/footings, Framing/rough-in, Final. Failure to post permit documents subjects project to re-inspection fees.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Wells Building and Safety Division before applying.

Need help with your project?

Navigating permits in Wells can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Elko County