County Building Permits

Churchill County Building Permit Guide (Unincorporated Area)

How to apply for a building permit in unincorporated Churchill County, Nevada. Permit authority, application steps, fees, and inspection requirements.

Nevada Updated March 2026

Permit Authority

Unincorporated areas of Churchill County (all areas outside the city limits of Fallon). Properties within Fallon city limits require City of Fallon permits.

Department
Churchill County Building Department (Public Works, Planning & Building Department)
Address
270 S. Maine Street, Suite A, Fallon, NV 89406
Phone
(775) 428-0264

Online Permit Portal

Platform: CitizenServe / County Online Portal • Account required: Yes • Submission: Online only

Application Process

  1. Contact the Building Department at (775) 428-0264 or buildings@churchillcountynv.gov for a pre-application consultation to discuss your project and determine permit requirements.
  2. Prepare required documents including site plans, structural drawings, and project valuation.
  3. Submit application and plans through the online portal.
  4. County staff will review submitted plans for code compliance.
  5. Upon approval, pay permit fees based on construction valuation.
  6. Permit is issued after fee payment and plan approval.
  7. Schedule inspections by contacting the department at least 24 hours prior to desired inspection date.

Typical processing time: Residential projects: 10-15 working days; Complex plans and commercial projects: 6-8 weeks. Timeframes are approximate and subject to vary depending on current workload and completeness of submitted plans.

Source: Churchill County Building Department (Public Works, Planning & Building Department)

General Requirements

Any new construction, additions, and alterations to existing buildings (residential and commercial); Accessory buildings and garages with floor area of 120 square feet or greater; Covered porches constructed with solid roof; Decks or patio structures 30 inches or more above grade; Repair or replacement of roof or roof covering; New construction or repair of individual residential septic systems; Placement of pre-fab storage sheds, carports, or cargo containers; Any structure over 120 square feet.

Required Documents

  • Completed building permit application
  • Site plan showing property boundaries and structure location
  • Structural drawings/plans (1 set if hard copies provided)
  • Construction plans may be emailed if electronic versions available
  • Project valuation must be provided by applicant at time of permit submittal
Permit validity
Building permits: Valid for 180 days from date of issuance or from date of last inspection. Septic construction permits: Valid for one year from date of issuance.
Building code
Churchill County participates in the Northern Nevada Code Amendments. Contact the Building Department for specific adopted code editions. The 2024 Northern Nevada Amendments were published February 20, 2025.
Owner-builder
Homeowners may obtain building permits for their own primary residence under Nevada NRS 624.031. Owner-builder must complete an Owner-Builder Affidavit of Exemption and acknowledge they may not sell or lease the property within 1 year of completion. Owner-builder must directly supervise construction. Any subcontractors must be properly licensed by NSCB. Unlicensed persons working on project must work under owner's direct supervision and be employed by owner. Owner must comply with all employer requirements (FICA, income tax withholding, workers compensation, unemployment compensation). Exemption applies to single-family residential structures only; does not apply to condos or apartments.
Contractor requirements
All contractors must be licensed by the Nevada State Contractors Board (NSCB). Contracting without a license is a crime in Nevada: First offense is a Misdemeanor with fine up to $1,000 and up to 6 months imprisonment; Second offense is a Gross Misdemeanor with fine of $2,000-$4,000 and up to 1 year imprisonment; Third offense is a Category E felony with fine of $5,000-$10,000 and 1-4 years state prison.

Fees

Plan check fee
Included in permit fee calculation based on valuation
Permit fee formula
Based on valuation of construction (approximately 0.3% of estimated value including labor and materials)
Payment note
Credit cards accepted (2.45% convenience fee added). Debit cards NOT accepted. Check or money order accepted.

Fees change. Verify current amounts at the official fee schedule.

Work That Does NOT Require a Permit

  • Accessory buildings smaller than 120 square feet (detached)
  • Concrete patio slabs
  • Concrete driveways
  • Wood decks less than 30 inches above grade
  • Shade porches covered with lattice (not solid roof)

Important: Exemptions from permit requirements do not grant authorization for work to be done in violation of code provisions or other laws. Zoning regulations may still apply. Even if a building permit is not required, all land in Churchill County is assigned a zoning district. Verify zoning compliance through the Planning Department.

Inspections

How to Schedule

  • buildings@churchillcountynv.gov (email)
  • (775) 428-0264 (phone)
Scheduling deadline
Minimum 24 hours prior to desired inspection date
Inspection hours
Monday through Friday, 8:30 AM to 3:30 PM

Typical inspection sequence: Typical sequence: Foundation Inspection (after excavations and reinforcing steel in place); Concrete Slab/Under-Floor Inspection (after all in-slab building service equipment, conduit, piping, and accessories are in place but before concrete is poured); Rough Framing Inspection (after roof, all framing, fire blocking, and bracing are in place; before insulation and drywall); Additional Inspections as required (insulation, drywall nail, roof nail, stucco lath, and others as determined by building official); Final Inspection (after finish grading and building is completed and ready for occupancy). Septic Inspections: Two inspections required - First when soil profile pit is dug, Second after completion of septic system but before covering with soil.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Churchill County Building Department (Public Works, Planning & Building Department) before applying.

Need help with your project?

Navigating permits in Unincorporated Churchill County can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.
← Back to Churchill County permit guides