City Building Permits
Somerville, MA Building Permit Guide
How to apply for a building permit in Somerville, Massachusetts. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
All properties within the City of Somerville.
- Department
- Inspectional Services Department (ISD) -- Building Division
- Address
- 1 Franey Road, Somerville, MA 02145
- Phone
- (617) 625-6600 ext. 5600
- isd@somervillema.gov
Online Permit Portal
Platform: CitizenServe • Account required: Yes • Submission: Online only
Additional resources:
Application Process
- Create account at https://www.somervillema.gov/citizenserve.
- Select 'building permit' and complete application.
- Upload required documents.
- Pay review fee at submission.
- Plans reviewer reviews application within 30 days of filing.
- Building inspector issues permit within 30 days of filing date if work conforms to requirements.
- Pay balance of permit fee and receive permit card.
- Post permit card at job site.
- Work must commence within six months of all permits being issued.
- Contact ISD for final inspection appointment upon project completion.
Typical processing time: Up to 30 days per statute; contact ISD for current timelines.
Source: Inspectional Services Department (ISD) -- Building Division
General Requirements
Building permit required for all construction, alteration, repair, demolition, or change of occupancy.
Required Documents
- For homeowners of 1-2 family dwellings: Proof of residence, Estimated Cost Affidavit, Plans (if required), Workplace Safety Affidavit, Wage Theft Prevention Affidavit
- For licensed contractors: Construction Supervisor License (CSL), Home Improvement Contractor (HIC) registration, Certificate of insurance and signed contract, Plans (where required), Workplace Safety Affidavit, Site Safety Plan, OSHA certification, Wage Theft Prevention Affidavit
- Permit validity
- Work must commence within 6 months of permit issuance; work must be completed within 2 years (standard Massachusetts provision; verify with department).
- Building code
- 780 CMR (transitioning to 10th Edition effective July 1, 2025)
- Owner-builder
- Owner-builders may obtain permits for own single-family residence.
- Contractor requirements
- All work must comply with 780 CMR and Somerville Zoning Ordinance. CSL required for all contractor work; HIC registration required for residential contractor work on 1-4 unit owner-occupied properties.
Fees
- Minimum permit fee
- $50
- Plan check fee
- $4.00 per $1,000 of estimated cost; $50.00 minimum
- Permit fee formula
- Building permit (base): $20.00 per $1,000 of estimated cost up to $100,000; $21.00 per $1,000 of estimated cost over $100,000
- Trade permit fee
- Varies by trade permit type
- Payment note
- Zoning review fee: $250. Safety review fee: 0.35% of estimated cost; $100.00 minimum. Residential use fee (1-3 units): $130.
Fees change. Verify current amounts at the official fee schedule (effective January 1, 2025).
Work That Does NOT Require a Permit
- Ordinary repairs to structures that do not affect structural elements, egress, fire protection systems, fire ratings, energy conservation, plumbing, gas, electrical, or other utilities
- Painting, tiling, and flooring are considered ordinary repairs and do not require a building permit
- One-story detached accessory structures (tool sheds, playhouses, etc.) not exceeding 120 sq ft
- Retaining walls not exceeding 4 feet in height measured from footing bottom to top
- Water tanks on grade with capacity not exceeding 5,000 gallons and height-to-diameter ratio not exceeding 2:1
- Sidewalks and driveways not more than 30 inches above adjacent grade, not over basement space, and not on an accessible route
Important: Somerville specifically confirms that painting, tiling, and flooring are considered ordinary repairs. Confirm all edge cases with the Building Division.
Inspections
How to Schedule
- (617) 625-6600 ext. 5600 (phone)
- isd@somervillema.gov (email)
- Scheduling deadline
- Contact ISD during public counter hours.
- Inspection hours
- Public counter hours: Monday through Thursday 9:00 AM - 11:00 AM and 1:00 PM - 3:00 PM; Friday 9:00 AM - 11:00 AM
Typical inspection sequence: The reverse side of the Building Permit card lists the required inspection sequence, which must be followed in order. Typical sequence: Foundation / footing; Framing; Insulation (where applicable); Final inspection. Applicant must make appointment with ISD for final inspection upon project completion.
Additional Resources
- Building code: 780 CMR (transitioning to 10th Edition effective July 1, 2025)
- Verify contractor license: Massachusetts CSL License Lookup
- Zoning information: View zoning info
- Zoning Ordinance
- Board of Building Regulations and Standards
- License lookup guide: Massachusetts Contractor License Requirements
- Contract template: Massachusetts Homeowner-Contractor Agreement
- Massachusetts hub: Massachusetts Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Inspectional Services Department (ISD) -- Building Division before applying.
Need help with your project?
Navigating permits in Somerville can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.