Town of West Tisbury, MA Building Permit Guide
How to apply for a building permit in Town of West Tisbury, Massachusetts. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
All properties within the Town of West Tisbury (rural/agricultural town in central Martha's Vineyard).
- Department
- Building Department
- Address
- 1059 State Road, 1st Floor, West Tisbury, MA 02575
- Phone
- (508) 696-0113
Online Permit Portal
Platform: PermitEyes • Account required: Yes • Submission: Online only
Additional resources:
Application Process
- Verify proposed use and dimensions comply with West Tisbury Zoning Bylaws. Zoning Inspector enforces zoning requirements.
- If work is within wetland buffer zone (100 feet from resource area; 200 feet from rivers), file with Conservation Commission and obtain Order of Conditions before permit issuance.
- Refer large-scale projects to Martha's Vineyard Commission (MVC) before town action if they meet Development of Regional Impact (DRI) thresholds. West Tisbury is a rural town with lower DRI lot-division thresholds (3 lots vs. 5 in nonrural areas).
- Submit permit application via PermitEyes portal (permiteyes.us/westtisbury) or paper application at Town Hall.
- Building Inspector reviews for 780 CMR compliance.
- Pay permit fees upon approval; permit issuance.
- Submit all inspection requests through Building Department via PermitEyes portal or Inspection Request Slip form.
- Certificate of Occupancy issued after all inspections pass.
Typical processing time: 1-2 weeks for standard permit review. Add 2-4 weeks for projects requiring zoning relief. MVC DRI projects add 2-4 months.
Source: Building Department
General Requirements
A building permit is required for all construction within the Town of West Tisbury except as exempted by 780 CMR 105.2.
Required Documents
- Permit application via PermitEyes portal or paper form at Town Hall
- Site plan and construction drawings
- Workers' compensation certificate or exemption affidavit
- CSL (Construction Supervisor License for structures over 35,000 cf) and/or HIC (Home Improvement Contractor) number, or Homeowner Exemption Affidavit
- Trench Permit Application (fillable PDF) for any excavation work
- ConCom Order of Conditions (if applicable)
- MVC approval (if DRI)
- Workers Compensation Insurance Affidavit
- Permit validity
- Must commence construction within 6 months of issuance. Work may lapse if suspended for 12 months.
- Building code
- 780 CMR (Massachusetts State Building Code, 10th Edition effective October 11, 2024). New Electrical Code effective February 17, 2023 (527 CMR 12.00, based on 2023 NEC).
- Owner-builder
- Homeowners of a 1- or 2-family primary residence may pull permits without a CSL or HIC license but must file a Homeowner Exemption Affidavit.
- Contractor requirements
- Contractors must hold a valid CSL (structures over 35,000 cf) or HIC registration for smaller residential work. Separate licensed contractors required for electrical, plumbing, and gas work.
Fees
- Minimum permit fee
- Not confirmed in accessible sources
- Plan check fee
- Included in permit fee
- Permit fee formula
- Based on construction value; specific per-$1,000 rate not publicly accessible in extractable form. Download current Permit Fees PDF from westtisbury-ma.gov/390/Forms-Documents.
- Trade permit fee
- Separate fees for electrical, plumbing, and gas permits
- Payment note
- Contact building department at (508) 696-0113 for current fee rate structure or download the July 1, 2025 Permit Fees PDF from the Forms and Documents page.
Fees change. Verify current amounts at the official fee schedule (effective July 1, 2025 (PDF available but not in extractable form as of March 2026)).
Work That Does NOT Require a Permit
- Sheds of 120 square feet or less not used for habitation (provided setback requirements are met; West Tisbury has explicitly confirmed this exemption)
- Fences not over 7 feet
- Retaining walls under 4 feet
- Sidewalks and driveways under 30 inches above grade
- Prefabricated pools under 24 inches deep
- Finish work (painting, tiling, carpeting, cabinets)
- All other standard 780 CMR 105.2 exemptions (see statewide overview)
Important: Exemptions from building permit do NOT exempt work from trade permits or Conservation Commission jurisdiction.
Inspections
How to Schedule
- (508) 696-0113 (phone)
- Scheduling deadline
- Submit Inspection Request Slip (PDF) or use PermitEyes portal
- Inspection hours
- Monday through Friday, 8:30 AM to 3:30 PM
- Time windows
- Specific inspection time windows not published in accessible sources
Typical inspection sequence: Standard inspection sequence per 780 CMR: footing/excavation, foundation, rough frame, insulation, final building. Trade inspections (rough and final electrical, plumbing, gas) scheduled through building department.
In-person inspection standard
Additional Resources
- Building code: 780 CMR (Massachusetts State Building Code, 10th Edition effective October 11, 2024). New Electrical Code effective February 17, 2023 (527 CMR 12.00, based on 2023 NEC).
- Verify contractor license: Massachusetts Board of Building Regulations and Standards - License Lookup
- Zoning information: View zoning info
- Owner-builder rules: View rules
- Conservation Commission
- Martha's Vineyard Commission (MVC)
- License lookup guide: Massachusetts Contractor License Requirements
- Contract template: Massachusetts Homeowner-Contractor Agreement
- Massachusetts hub: Massachusetts Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Department before applying.
Need help with your project?
Navigating permits in Town of West Tisbury can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Dukes County
View all Dukes County jurisdictions →