Stark County Building Permit Guide (Unincorporated Area)

How to apply for a building permit in unincorporated Stark County, Illinois. Permit authority, application steps, fees, and inspection requirements.

Illinois Updated March 2026

Permit Authority

Covers all areas of the county not within incorporated city/village limits.

Department
Stark County Department of Building & Zoning
Address
130 W. Main St., Toulon, IL 61483
Phone
(309) 286-7172

Online Permit Portal

Platform: iWorq • Account required: Yes • Submission: In-person only

Application Process

  1. Verify PIN and zoning classification.
  2. Submit online via iWorq or in person.
  3. Attach site plans and structural drawings.
  4. For new residential construction, attach Health Department septic/well approval.
  5. Pay fees ($0.10/sq ft).
  6. Receive permit upon approval.

Typical processing time: 10-14 business days

Source: Stark County Department of Building & Zoning

General Requirements

All new buildings, additions, alterations, and relocations of structures.

Required Documents

  • Site plan
  • Building plans
  • Health department approval (if applicable)
Permit validity
12 months
Building code
IBC 2021, IRC 2021, IECC 2021, NEC 2023
Owner-builder
Residents may act as their own contractor.
Contractor requirements
IL state licenses required for plumbers and roofers.

Fees

Minimum permit fee
$150.00
Plan check fee
Bundled
Permit fee formula
$0.10/sq ft for living area; $0.05/sq ft for garages/sheds/decks
Reinspection fee
50% penalty for starting without a permit
Payment note
Credit/Debit online; Check/Cash in office

Fees change. Verify current amounts at the official fee schedule.

Work That Does NOT Require a Permit

  • Agricultural buildings (for permit fees; must still meet setbacks)
  • Detached structures under 120 sq ft (zoning only)
  • Painting, wallpapering, and similar finish work

Important: Exempt from building permit does not mean exempt from zoning requirements. Confirm edge cases with the Stark County Department of Building & Zoning before proceeding.

Inspections

How to Schedule

  • (309) 286-7172 (phone)
Inspection hours
Weekdays 8:30 AM - 4:30 PM

Typical inspection sequence: Typical sequence: Foundation, Framing/Rough-in, Final.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Stark County Department of Building & Zoning before applying.

Need help with your project?

Navigating permits in Unincorporated Stark County can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.
← Back to Stark County permit guides