City Building Permits

O'Fallon, ILLINOIS Building Permit Guide

How to apply for a building permit in O'Fallon, Illinois. Permit authority, application steps, fees, and inspection requirements.

Illinois St. Clair County Updated March 2026

Permit Authority

Incorporated City of O'Fallon.

Department
Community Development Department (Building & Inspections Division)
Address
255 S. Lincoln Ave., O'Fallon, IL 62269
Phone
(618) 624-4500, ext. 4

Online Permit Portal

Platform: Downloadable PDF forms • Account required: No • Submission: In-person only

Application Process

  1. Download and complete the Building Permit Application.
  2. Submit application with project costs and contractor information.
  3. Plan review conducted by Building, Fire, and Engineering divisions.
  4. Notification of approval and fee payment.
  5. Permit issuance.

Typical processing time: Not specified

Source: Community Development Department (Building & Inspections Division)

General Requirements

New construction, additions, structural alterations, electrical/plumbing/mechanical updates.

Required Documents

  • Application
  • Plans
  • Contractor information
Permit validity
Not specified
Building code
2021 IBC, 2021 IRC, 2020 NEC, Illinois Plumbing Code
Owner-builder
Not specified
Contractor requirements
Standard state requirements; local registration may apply.

Fees

Minimum permit fee
$50
Plan check fee
Fire plan review $75+
Permit fee formula
Valuation-based and project-type flat fees
Trade permit fee
Not specified
Reinspection fee
Not specified
Penalty (no permit)
Not specified
Payment note
Not specified

Fees change. Verify current amounts at the official fee schedule (effective Not specified).

Work That Does NOT Require a Permit

  • Painting, papering, tiling, carpeting, cabinets, and countertops
  • Retaining walls under 4 feet (no surcharge)
  • Private sidewalks/driveways under 30 inches above grade
  • Reroofing (asphalt shingles) and window/door replacement (same opening size)

Important: Confirm with Building & Inspections Division before proceeding with exempt work.

Inspections

How to Schedule

  • (618) 624-4500, ext. 4 (phone)
Scheduling deadline
Not specified
Inspection hours
Not specified
Time windows
Not specified

Typical inspection sequence: Typical sequence: Footing, Rough-in, Final.

Not specified

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Community Development Department (Building & Inspections Division) before applying.

Need help with your project?

Navigating permits in O'Fallon can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in St. Clair County

View all St. Clair County jurisdictions →