City Building Permits

Fairview Heights, ILLINOIS Building Permit Guide

How to apply for a building permit in Fairview Heights, Illinois. Permit authority, application steps, fees, and inspection requirements.

Illinois St. Clair County Updated March 2026

Permit Authority

Incorporated City of Fairview Heights.

Department
Land Use & Development Department
Address
10025 Bunkum Road, Fairview Heights, IL 62208
Phone
(618) 489-2060

Online Permit Portal

Platform: MyGov Collaborator • Account required: Yes • Submission: Online only

Application Process

  1. Register/Login to the MyGov portal.
  2. Submit Full Building Permit Application online.
  3. Upload three sets of construction documents/drawings.
  4. Pay $100 non-refundable review fee.
  5. Plan review and approval.
  6. Pay remaining permit fees and receive permit.

Typical processing time: Not specified

Source: Land Use & Development Department

General Requirements

New construction, additions, structural changes, major system overhauls.

Required Documents

  • Application
  • 3 sets of plans
Permit validity
2 years (must start within 6 months)
Building code
2021 IBC, 2021 IRC, 2011 NEC, 2014 Illinois Plumbing Code
Owner-builder
Not specified
Contractor requirements
State licensing for trades.

Fees

Minimum permit fee
Not specified
Plan check fee
$100 non-refundable
Permit fee formula
Valuation-based
Trade permit fee
Not specified
Reinspection fee
Not specified
Penalty (no permit)
Not specified
Payment note
Paid via MyGov portal

Fees change. Verify current amounts at the official fee schedule (effective Not specified).

Work That Does NOT Require a Permit

  • Residential fences (must meet height/setback rules)
  • Detached accessory structures under 200 square feet
  • Swimming pools 24 inches or less in depth
  • Minor repairs and general maintenance

Important: Confirm all exempt work classifications with the Land Use & Development Department before proceeding.

Inspections

How to Schedule

Scheduling deadline
24 hours in advance
Inspection hours
Not specified
Time windows
Not specified

Typical inspection sequence: Typical sequence: Footing, Foundation, Framing, Final.

Not specified

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Land Use & Development Department before applying.

Need help with your project?

Navigating permits in Fairview Heights can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.