City Building Permits
Village of Hillsdale, ILLINOIS Building Permit Guide
How to apply for a building permit in Village of Hillsdale, Illinois. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Hillsdale contracts with Rock Island County for building permits and inspections.
- Department
- Rock Island County Zoning and Building Safety Department
- Address
- 1504 Third Avenue, Room 305, Rock Island, IL 61201
- Phone
- 309-558-3771
- gthorpe@ricountyil.gov
Online Permit Portal
Platform: N/A (Downloadable PDF) • Account required: No • Submission: In-person only
Application Process
- Contact Hillsdale Village Hall (309-658-2433) for local zoning approval if required.
- Submit building permit application and plans to Rock Island County.
- County staff reviews for code and flood compliance.
- Pay fees at County office.
- Permit issued.
Typical processing time: 2-4 weeks
Source: Rock Island County Zoning and Building Safety Department
General Requirements
New homes, garages, sheds over 200 sq ft, additions, remodels, and all systems.
Required Documents
- Application
- Plans
- Contractor registration
- Permit validity
- Varies; confirm with County
- Building code
- 2012 IBC, 2012 IRC, 2011 NEC, Illinois Plumbing Code
- Owner-builder
- Allowed for primary residence.
- Contractor requirements
- Must register with County ($10,000 bond).
Fees
- Minimum permit fee
- $50.00-$100.00 (Estimated)
- Plan check fee
- Included
- Permit fee formula
- Valuation-based ($18 per $1,000 typically)
- Trade permit fee
- Included in valuation-based scale
- Reinspection fee
- Varies
- Penalty (no permit)
- Double fee for work without permit
- Payment note
- Cash or check only at County office
Fees change. Verify current amounts at the official fee schedule (effective 2026-03).
Work That Does NOT Require a Permit
- Accessory structures 120 sq ft or less
- Fences 6 feet or less (zoning still required)
- Retaining walls 4 feet or less
- Cosmetic finishes: painting, tiling, carpeting
- Swimming pools less than 18 inches deep
Important: Confirm edge cases with County before proceeding.
Inspections
How to Schedule
- 309-558-3771 (phone)
- Scheduling deadline
- Contact County for details
- Inspection hours
- Inspectors in field 10:00 AM - 3:00 PM
- Time windows
- 10:00 AM - 3:00 PM
Typical inspection sequence: Typical sequence: Footing, Rough, Final
Additional Resources
- Building code: 2012 IBC, 2012 IRC, 2011 NEC, Illinois Plumbing Code
- Zoning information: View zoning info
- Hillsdale Village Hall
- License lookup guide: Illinois Contractor License Requirements
- Contract template: Illinois Homeowner-Contractor Agreement
- Illinois hub: Illinois Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Rock Island County Zoning and Building Safety Department before applying.
Need help with your project?
Navigating permits in Village of Hillsdale can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Rock Island County