City Building Permits
Village of Coal Valley, ILLINOIS Building Permit Guide
How to apply for a building permit in Village of Coal Valley, Illinois. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
All properties within the incorporated village limits of Coal Valley.
- Department
- Building and Inspections Division
- Address
- 900 1st Street, Coal Valley, IL 61240
- Phone
- 309-799-3604
- info@coalvalleyil.org
Online Permit Portal
Platform: N/A (Downloadable PDF) • Account required: No • Submission: In-person only
Application Process
- Download application from village website.
- Submit application and two copies of plans to Village Hall.
- Plans reviewed (typically within 5 business days).
- Pay fees and receive permit.
- Post permit at job site.
Typical processing time: 5 business days for plan review
General Requirements
New construction, additions, decks, pools, re-roofing, and MEP systems.
Required Documents
- Application
- Two sets of plans
- Radon remediation plan for new builds
- Permit validity
- Varies; confirm with Building Inspector
- Building code
- 2018 IBC, 2018 IMC, 2017 NEC, Illinois Plumbing Code
- Contractor requirements
- Must be registered.
Fees
- Minimum permit fee
- $25.00
- Plan check fee
- Included in permit fee
- Permit fee formula
- Valuation-based or square footage ($0.07/sq ft for new builds)
- Trade permit fee
- Included in valuation-based scale
- Reinspection fee
- $30.00 for additional inspections
- Penalty (no permit)
- $45-$750/day for violations
- Payment note
- Cash or check at Village Hall
Fees change. Verify current amounts at the official fee schedule (effective 2026-03).
Work That Does NOT Require a Permit
- Fences 6 feet or less (zoning approval still required)
- Sheds/Accessory structures 120 sq ft or less (70 sq ft if in floodplain)
- Cosmetic finishes: painting, tiling, cabinets
- Retaining walls 4 feet or less
- Swimming pools less than 18 inches deep
- Playground equipment
Important: First two inspections included in base fee; confirm edge cases before proceeding.
Inspections
How to Schedule
- 309-799-3604 (phone)
- Scheduling deadline
- Contact Building Inspector for details
- Inspection hours
- Monday - Friday
- Time windows
- Field inspections during office hours
Typical inspection sequence: Typical sequence: Footing, Foundation, Framing, Rough, Final
Additional Resources
- Building code: 2018 IBC, 2018 IMC, 2017 NEC, Illinois Plumbing Code
- Zoning information: View zoning info
- License lookup guide: Illinois Contractor License Requirements
- Contract template: Illinois Homeowner-Contractor Agreement
- Illinois hub: Illinois Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building and Inspections Division before applying.
Need help with your project?
Navigating permits in Village of Coal Valley can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Rock Island County