City Building Permits
Village of Andalusia, ILLINOIS Building Permit Guide
How to apply for a building permit in Village of Andalusia, Illinois. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Andalusia contracts with Rock Island County for all building inspections.
- Department
- Rock Island County Zoning and Building Safety Department
- Address
- 1504 Third Avenue, Room 305, Rock Island, IL 61201
- Phone
- 309-558-3771
- gthorpe@ricountyil.gov
Online Permit Portal
Platform: N/A (PDF Download) • Account required: No • Submission: In-person only
Application Process
- Obtain zoning approval from Andalusia Village Hall (309-798-2215).
- Submit County permit application and plans to Rock Island County.
- Review for code and flood compliance.
- Pay fees to County.
- Permit issued.
Typical processing time: 2-4 weeks
Source: Rock Island County Zoning and Building Safety Department
General Requirements
New buildings, additions, remodels, systems, windows, roofing, and siding.
Required Documents
- Application
- Site plan
- Construction drawings
- Permit validity
- Varies; confirm with County
- Building code
- 2012 IBC, 2012 IRC, 2011 NEC, Illinois Plumbing Code
- Owner-builder
- Allowed for primary residence.
- Contractor requirements
- Must register with County.
Fees
- Minimum permit fee
- $25.00 (Village Floodplain app); County fees based on valuation
- Plan check fee
- Included
- Permit fee formula
- Valuation-based
- Trade permit fee
- Included in valuation-based scale
- Reinspection fee
- Varies
- Penalty (no permit)
- Double fee for work without permit
- Payment note
- Cash or check only
Fees change. Verify current amounts at the official fee schedule (effective 2026-03).
Work That Does NOT Require a Permit
- Accessory structures 120 sq ft or less
- Fences 6 feet or less
- Retaining walls 4 feet or less
- Cosmetic finishes
- Swimming pools less than 18 inches deep
Important: Confirm edge cases with County before proceeding.
Inspections
How to Schedule
- 309-558-3771 (phone)
- Scheduling deadline
- Contact County for details
- Inspection hours
- Monday - Friday
- Time windows
- Field inspections during office hours
Typical inspection sequence: Typical sequence: Footing, Rough, Final
Additional Resources
- Building code: 2012 IBC, 2012 IRC, 2011 NEC, Illinois Plumbing Code
- Zoning information: View zoning info
- Rock Island County GIS Mapping App
- License lookup guide: Illinois Contractor License Requirements
- Contract template: Illinois Homeowner-Contractor Agreement
- Illinois hub: Illinois Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Rock Island County Zoning and Building Safety Department before applying.
Need help with your project?
Navigating permits in Village of Andalusia can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Rock Island County