City Building Permits

Village of Bement, ILLINOIS Building Permit Guide

How to apply for a building permit in Village of Bement, Illinois. Permit authority, application steps, fees, and inspection requirements.

Illinois Piatt County Updated March 2026

Permit Authority

Village of Bement corporate limits. Properties outside village limits fall under Piatt County Zoning.

Department
Village Office
Address
143 W. Wilson St., Bement, IL 61813
Phone
(217) 678-4741

Online Permit Portal

Platform: Paper application • Account required: No • Submission: In-person only

Application Process

  1. Contact Village of Bement at (217) 678-4741 to obtain a building permit application.
  2. Submit completed application in person at the village office (143 W. Wilson St.).
  3. Include required site plan and construction documents.
  4. Pay applicable fees.
  5. Permit issued. Schedule inspections as required.

Typical processing time: Not publicly available. Contact village directly.

Source: Village Office

General Requirements

Building permits required prior to construction, alteration, moving, demolition, or repair of any building or structure per the Bement village code.

Required Documents

  • Completed building permit application form
  • Site plan
  • Construction plans
Permit validity
Not publicly available. Contact village.
Building code
Not reported to Illinois CDB Code Directory. As of January 1, 2025, Illinois PA 103-0510 mandates IBC 2021, IRC 2021, IEBC 2021, NEC 2023, Illinois Energy Conservation Code, Illinois Accessibility Code, and Illinois Plumbing Code as statewide minimum standards. Confirm locally-adopted edition with village.
Owner-builder
Not publicly available.
Contractor requirements
No Illinois state general contractor license. IDFPR-licensed electricians and plumbers required for those trades.

Fees

Permit fee formula
Not publicly available.
Payment note
Contact village office.

Work That Does NOT Require a Permit

Contact the Village Office to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • (217) 678-4741 (phone)
Inspection hours
Not confirmed. Call before visiting.

Typical inspection sequence: Not publicly documented.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Village Office before applying.

Need help with your project?

Navigating permits in Village of Bement can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Piatt County

View all Piatt County jurisdictions →