City Building Permits

Village of Maryville, ILLINOIS Building Permit Guide

How to apply for a building permit in Village of Maryville, Illinois. Permit authority, application steps, fees, and inspection requirements.

Illinois Madison County Updated March 2026

Permit Authority

Village of Maryville limits.

Department
Building and Zoning Department
Address
2520 North Center Street, Maryville, IL 62062
Phone
(618) 345-7028 (ext. 2327)

Online Permit Portal

Platform: In-house / Maryville Permit Portal • Account required: Yes • Submission: Online only

Application Process

  1. Register on the Maryville Permit Portal.
  2. Submit Building Permit Application with plans and a copy of the recorded deed.
  3. For commercial, plans must be signed/sealed by an IL-licensed architect.
  4. Department reviews for zoning and code compliance.
  5. Pay fees and receive Certificate of Occupancy upon final inspection.

Typical processing time: Not specified.

Source: Building and Zoning Department

General Requirements

New construction, structural alterations, significant electrical/plumbing work.

Required Documents

  • Recorded deed
  • Construction plans
  • Application form
Permit validity
Not specified.
Building code
2012 IBC, 2020 NEC, Illinois State Plumbing Code. Transitioning to 2025 statewide standards.
Owner-builder
Permitted for primary residence.
Contractor requirements
Contractors must be registered.

Fees

Minimum permit fee
Valuation-based base fee
Plan check fee
Varies
Permit fee formula
Valuation-based plus specific trade fees
Reinspection fee
Not specified
Payment note
Online payments accepted

Fees change. Verify current amounts at the official fee schedule.

Work That Does NOT Require a Permit

  • Ordinary minor repairs (non-structural)
  • Re-roofing (shingle replacement only)
  • Siding installation
  • Minor maintenance

Inspections

How to Schedule

  • (618) 345-7028 ext. 2324 (phone)
  • inspections@maryville-il.us (email)
Scheduling deadline
24-hour notice required for all inspections
Inspection hours
Monday - Friday, 7:00 AM - 3:30 PM

Typical inspection sequence: Rough-in, Final

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building and Zoning Department before applying.

Need help with your project?

Navigating permits in Village of Maryville can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Madison County

View all Madison County jurisdictions →