City Building Permits

Village of Round Lake, ILLINOIS Building Permit Guide

How to apply for a building permit in Village of Round Lake, Illinois. Permit authority, application steps, fees, and inspection requirements.

Illinois Lake County Updated March 2026

Permit Authority

All properties within the incorporated Village of Round Lake.

Department
Building & Zoning Department
Address
442 N. Cedar Lake Road, Round Lake, IL 60073
Phone
(847) 546-5400

Online Permit Portal

Platform: Online/In-Person • Account required: No • Submission: Online only

Additional resources:

Application Process

  1. Submit application, plat of survey, and detailed plans to the Building & Zoning Department
  2. Ensure all contractors are registered with the Village and provide proof of insurance and licensing
  3. Plan review conducted for compliance with 2025 statewide baseline codes
  4. Pay fees and receive permit
  5. Provide 24-48 hours notice for all inspection requests

Typical processing time: Varies; contact department

Source: Building & Zoning Department

General Requirements

Most structural, electrical, plumbing, and mechanical work, including decks, fences, roofs, siding, sheds, driveways, and pools

Required Documents

  • Completed permit application
  • Plat of survey
  • Detailed construction plans
  • Contractor information
Permit validity
Code requirements in effect on Jan 1 of the application year remain in effect for the project duration
Building code
Transitioning to 2021/2024 International Codes per PA 103-0510
Contractor requirements
All contractors must be registered with the Village and provide proof of insurance and licensing

Fees

Minimum permit fee
Contact department
Permit fee formula
Project-specific; contact the department for a quote
Payment note
Contractor registration fees apply annually

Fees change. Verify current amounts at the official fee schedule (effective Project-specific).

Work That Does NOT Require a Permit

  • Minor cosmetic maintenance

Important: Check with the department for specific exemptions

Inspections

How to Schedule

  • (847) 546-5400 (phone)
Scheduling deadline
24-48 hours notice required
Inspection hours
Standard business hours

Typical inspection sequence: Inspections required at foundation, framing, and final stages

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building & Zoning Department before applying.

Need help with your project?

Navigating permits in Village of Round Lake can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Lake County

View all Lake County jurisdictions →