City Building Permits

Village of Millington, ILLINOIS Building Permit Guide

How to apply for a building permit in Village of Millington, Illinois. Permit authority, application steps, fees, and inspection requirements.

Illinois Kendall County Updated March 2026

Permit Authority

Village of Millington (Spans Kendall and LaSalle Counties).

Department
Village of Millington Building Department
Address
206 Walnut Street, Millington, IL 60537
Phone
815-695-5383

Online Permit Portal

Platform: Manual / PDF download • Account required: No • Submission: In-person only

Application Process

  1. Download application from village website.
  2. Submit application and plans to Building Inspector Justin Cyr.
  3. Review process for code and zoning compliance.
  4. Fees calculated and paid to the Village.
  5. Permit issued.

Typical processing time: 7-10 days.

Source: Village of Millington Building Department

General Requirements

Mandatory for all construction, renovation, and demolition.

Required Documents

  • Completed application
  • Site plan
  • Construction drawings
Permit validity
Work must start within 6 months.
Building code
Illinois Statewide Codes (IBC/IRC 2021)
Owner-builder
Permitted.
Contractor requirements
State licenses for plumbing/roofing required.

Fees

Minimum permit fee
Contact inspector for project-specific minimums
Plan check fee
Included in permit fee or separate based on complexity
Permit fee formula
Per project type/valuation
Trade permit fee
Included in overall application
Reinspection fee
Penalty fees for failed inspections
Penalty (no permit)
DOUBLE FEES if work begins without an approved permit
Payment note
Payments made to Village of Millington.

Fees change. Verify current amounts at the official fee schedule (effective Current).

Work That Does NOT Require a Permit

  • Very minor repairs (non-structural, non-mechanical)
  • Cosmetic work (painting, flooring)

Inspections

How to Schedule

  • 630-688-2565 (Inspector Justin Cyr) (phone)
Inspection hours
By appointment

Typical inspection sequence: Typical sequence: Footing, Framing/Roughs, Final.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Village of Millington Building Department before applying.

Need help with your project?

Navigating permits in Village of Millington can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.