City Building Permits
Batavia, ILLINOIS Building Permit Guide
How to apply for a building permit in Batavia, Illinois. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
City of Batavia corporate limits.
- Department
- City of Batavia Building Division
- Address
- 100 N. Island Avenue, Batavia, IL 60510
- Phone
- 630-454-2000
- Website
- https://www.bataviail.gov
Online Permit Portal
Platform: Batavia Online Permits • Account required: Yes • Submission: In-person only
Application Process
- Apply online via One-Stop portal (for simple projects) or email for complex ones.
- Plan review (typically 2 weeks).
- Fee payment via online portal or at City Hall.
- Permit issuance.
Typical processing time: 10-14 days for standard projects.
General Requirements
New construction, additions, alterations, fences, sheds.
Required Documents
- Plat of Survey
- Professional plans for additions/new builds
- Permit validity
- 18 months.
- Building code
- 2006 IBC/IRC, 2005 NEC, 2024 IECC, 2014 Illinois Plumbing Code.
- Owner-builder
- Homeowners can do most work except for large electrical service upgrades.
- Contractor requirements
- No general registration; state licenses required for plumbers/roofers.
Fees
- Minimum permit fee
- $85
- Plan check fee
- $300-$1000 submittal fee for commercial
- Permit fee formula
- Flat fees for common items; $19 per 100 sq ft for additions.
- Reinspection fee
- $100 per re-inspection
- Payment note
- Online portal accepts Credit/Debit cards
Fees change. Verify current amounts at the official fee schedule (effective 2026-03).
Work That Does NOT Require a Permit
- Cosmetic alterations (kitchen/bath cabinet replacement)
- Brick or concrete patios at grade
- Fences under 6 feet (Note: Fences actually DO require a permit in Batavia per other sources; verify locally)
- Minor repairs
Important: Verify fence requirements locally as conflicting guidance exists.
Inspections
How to Schedule
- 630-454-2000 (phone)
- Inspection hours
- Monday-Friday, 8:00 AM - 3:00 PM
Typical inspection sequence: Pre-pour, Rough, Final.
Additional Resources
- Building code: 2006 IBC/IRC, 2005 NEC, 2024 IECC, 2014 Illinois Plumbing Code.
- Zoning information: View zoning info
- License lookup guide: Illinois Contractor License Requirements
- Contract template: Illinois Homeowner-Contractor Agreement
- Illinois hub: Illinois Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Batavia Building Division before applying.
Need help with your project?
Navigating permits in Batavia can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Kane County
View all Kane County jurisdictions →