City Building Permits
Kewanee, ILLINOIS Building Permit Guide
How to apply for a building permit in Kewanee, Illinois. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Incorporated limits of the City of Kewanee
- Department
- City of Kewanee Community Development Department
- Address
- 401 East Third Street, Kewanee, IL 61443
- Phone
- (309) 852-2611 Ext. 267
Online Permit Portal
Platform: City of Kewanee Permit Portal • Account required: No • Submission: In-person only
Additional resources:
Application Process
- Download Building, Electrical, Plumbing & Mechanical Permit Application
- Submit plans (stamped drawings required for new construction/commercial)
- Department reviews for zoning and code compliance
- Pay fees at City Hall
- Permit issued
Typical processing time: 7-14 business days
General Requirements
New construction, additions, structural alterations, accessory buildings (sheds/garages), fences, and decks
Required Documents
- Building Permit Application
- Site Plan
- Construction Drawings
- Permit validity
- 6 months to start; 1 year to complete
- Building code
- 2021 IBC/IRC
- Owner-builder
- Allowed for primary residence
- Contractor requirements
- Registration with city required; State license for roofing/plumbing
Fees
- Minimum permit fee
- $10.00 (filing fee) + base fee
- Plan check fee
- Included in permit fee
- Permit fee formula
- Square footage based ($40 + $6.50/100 sqft for residential)
- Reinspection fee
- $50.00
- Payment note
- Payable at City Hall
Fees change. Verify current amounts at the official fee schedule (effective March 2026).
Work That Does NOT Require a Permit
- Shingle-only roof replacement
- Non-metallic siding
- Painting, floor coverings
- Fences under 6 feet (zoning check recommended)
Important: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm with the City of Kewanee Community Development Department before proceeding.
Inspections
How to Schedule
- (309) 852-2611 (phone)
- Scheduling deadline
- 24-hour notice required
- Inspection hours
- 8:00 AM - 5:00 PM
Typical inspection sequence: Typical sequence: Footing, Rough-in (Electrical/Plumbing/Mechanical), Framing, Final
Additional Resources
- Building code: 2021 IBC/IRC
- Verify contractor license: Illinois Secretary of State Contractor License Lookup
- Zoning information: View zoning info
- License lookup guide: Illinois Contractor License Requirements
- Contract template: Illinois Homeowner-Contractor Agreement
- Illinois hub: Illinois Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Kewanee Community Development Department before applying.
Need help with your project?
Navigating permits in Kewanee can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Henry County