City Building Permits

Morris, ILLINOIS Building Permit Guide

How to apply for a building permit in Morris, Illinois. Permit authority, application steps, fees, and inspection requirements.

Illinois Grundy County Updated March 2026

Permit Authority

Serves the incorporated City of Morris.

Department
City of Morris Building and Zoning Office
Address
700 N. Division Street, Morris, IL 60450
Phone
815-942-1855

Online Permit Portal

Platform: Document Center (PDF downloads) • Account required: No • Submission: In-person only

Application Process

  1. Contact the Zoning Officer to verify requirements for the specific project.
  2. Download and complete the appropriate application from the Document Center.
  3. Submit two sets of plans and a Plat of Survey.
  4. Pay the required plan review fee and state surcharge.

Typical processing time: Typically 5 to 10 business days for standard reviews.

Source: City of Morris Building and Zoning Office

General Requirements

New construction, additions, remodeling, decks, fences, sheds, roofing, siding, and sign installation.

Required Documents

  • Plat of Survey
  • Building plans
  • Contractor list
Permit validity
1 year from date of issuance.
Building code
2021 IBC/IRC (State mandate), 2008 NEC, 2015 NFPA 101, Current Illinois Plumbing Code
Owner-builder
Allowed for primary residence work.
Contractor requirements
Contractors must be registered with the city.

Fees

Minimum permit fee
$100.00
Plan check fee
50 percent of permit fee for Residential; 65 percent for Commercial.
Permit fee formula
Valuation-based using UBC Table 1A.
Penalty (no permit)
Penalty of double fee for work started without a permit.
Payment note
State surcharge is greater of 0.0005 x valuation or $1.00.

Fees change. Verify current amounts at the official fee schedule (effective 2026-03).

Work That Does NOT Require a Permit

  • Painting, papering, tiling, carpeting
  • Cabinets, counter tops and similar finish work
  • Swings and other playground equipment

Important: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Building Office before proceeding.

Inspections

How to Schedule

  • 815-942-1855 (phone)
Inspection hours
Monday through Friday during business hours

Typical inspection sequence: Typical sequence: Stake-out, Footing, Foundation, Rough-in, Insulation, Final.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Morris Building and Zoning Office before applying.

Need help with your project?

Navigating permits in Morris can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Grundy County

View all Grundy County jurisdictions →