City Building Permits

Village of Mazon, ILLINOIS Building Permit Guide

How to apply for a building permit in Village of Mazon, Illinois. Permit authority, application steps, fees, and inspection requirements.

Illinois Grundy County Updated March 2026

Permit Authority

Incorporated Village of Mazon.

Department
Village of Mazon Planning and Inspections Department
Address
520 Depot St, Mazon, IL 60444
Phone
815-448-2151

Online Permit Portal

Platform: PDF Document Center • Account required: No • Submission: In-person only

Application Process

  1. Download application from website or collect at Village Hall.
  2. Submit with Plat of Survey showing proposed project location and setbacks.
  3. For fences, ensure post hole depth is noted as 42 inches minimum.
  4. Submit contractor registration for all trades.

Typical processing time: Not specified.

Source: Village of Mazon Planning and Inspections Department

General Requirements

New builds, additions, remodeling, decks, fences, sheds, pools, and roofing (tear-off).

Required Documents

  • Plat of Survey
  • Building plans
  • Contractor list
Permit validity
Not specified.
Building code
2021 IBC/IRC (State mandate effective 2025)
Owner-builder
Homeowners may perform their own work.
Contractor requirements
All contractors must be registered with the Village.

Fees

Minimum permit fee
$25.00 (Roof/Deck/Fence)
Plan check fee
Included in permit cost.
Permit fee formula
Flat fees for miscellaneous; $0.30 per sq ft for additions/remodels.
Reinspection fee
Inspection fee for new construction is $500 (covers 4 inspections).
Payment note
Impact fees for new construction total $2,000 plus tap-on fees.

Fees change. Verify current amounts at the official fee schedule (effective 2026-03).

Work That Does NOT Require a Permit

  • Painting and wallpapering
  • Non-structural landscaping
  • Minor repairs

Important: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with Planning and Inspections Department before proceeding.

Inspections

How to Schedule

  • 815-448-2151 (phone)
Scheduling deadline
24-hour notice required for scheduling.
Inspection hours
Business hours

Typical inspection sequence: Typical sequence: Footing, Rough-in, Final.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Village of Mazon Planning and Inspections Department before applying.

Need help with your project?

Navigating permits in Village of Mazon can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Grundy County

View all Grundy County jurisdictions →