City Building Permits
Village of Westmont, ILLINOIS Building Permit Guide
How to apply for a building permit in Village of Westmont, Illinois. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Serves the Village of Westmont.
- Department
- Community Development Department - Permitting Division
- Address
- 31 W. Quincy St, Westmont, IL 60559
- Phone
- (630) 981-6250
Online Permit Portal
Platform: Email/Form Submission • Account required: No • Submission: In-person only
Application Process
- Submit General Permit Application signed by owner.
- Provide 3 sets of drawings (stamped by architect if structural).
- Pay non-refundable $100 deposit (applies to final fee).
- Village reviews plans and calculates final fees.
- Pay fees and receive permit.
Typical processing time: Express permits 1-2 days; complex varies.
Source: Community Development Department - Permitting Division
General Requirements
Most construction, renovation, remodeling. Additions, fences, decks, roofs, HVAC, water heaters, generators.
Required Documents
- Plat of Survey
- 3 sets drawings
- Contractor registration
- Permit validity
- Varies.
- Building code
- 2021 IBC, 2021 IRC, 2020 NEC, Illinois Plumbing Code.
- Owner-builder
- Affidavit required.
- Contractor requirements
- All contractors must be registered.
Fees
- Minimum permit fee
- $100 base admin fee
- Plan check fee
- $100 minimum or 0.4% cost due at submittal
- Permit fee formula
- $100 base + 1.5% construction cost + inspection fees. Flat $100+inspections for fences/roofs/HVAC.
- Trade permit fee
- Varies
- Reinspection fee
- $50 residential inspection (first free); $100 non-residential
- Penalty (no permit)
- Penalty for unpermitted work
- Payment note
- Cash bonds required for many projects (e.g. 1% of cost)
Fees change. Verify current amounts at the official fee schedule (effective Current).
Work That Does NOT Require a Permit
- Cosmetic work
- Same-size replacements of non-utility items
Important: Confirm exempt work categories with Permitting Division before proceeding.
Inspections
How to Schedule
- Scheduling deadline
- Call or email for scheduling windows.
- Inspection hours
- Monday - Friday, 8:00 AM - 4:00 PM
- Time windows
- Standard business hours.
Typical inspection sequence: Footing, Rough, Final.
Contact Permitting Division for remote inspection eligibility.
Additional Resources
- Building code: 2021 IBC, 2021 IRC, 2020 NEC, Illinois Plumbing Code.
- Verify contractor license: Illinois Department of Financial and Professional Regulation
- Zoning information: View zoning info
- 2025 Amended Zoning Ordinance effective August 2025
- License lookup guide: Illinois Contractor License Requirements
- Contract template: Illinois Homeowner-Contractor Agreement
- Illinois hub: Illinois Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Community Development Department - Permitting Division before applying.
Need help with your project?
Navigating permits in Village of Westmont can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in DuPage County