DuPage County Building Permit Guide (Unincorporated Area)

How to apply for a building permit in unincorporated DuPage County, Illinois. Permit authority, application steps, fees, and inspection requirements.

Illinois Updated March 2026

Permit Authority

Serves all unincorporated areas of DuPage County.

Department
Building and Zoning Department
Address
421 N. County Farm Road, Wheaton, IL 60187
Phone
(630) 407-6700

Online Permit Portal

Platform: Accela • Account required: Yes • Submission: Online only

Application Process

  1. Register on Accela Citizen Access.
  2. Submit application and upload PDF plans/survey.
  3. Review for building, zoning, and stormwater compliance.
  4. Notification of approval and fees.
  5. Pay fees and bonds online.
  6. Permit issued via portal.

Typical processing time: Varies; depends on stormwater/wetland impacts.

Source: Building and Zoning Department

General Requirements

New construction, additions, major renovations, demolition, roofs (tear-offs), siding (not overlay), windows, HVAC, decks, fences, pools (>24" deep).

Required Documents

  • Scalable Plat of Survey
  • PDF construction plans
  • Contractor registration
Permit validity
Varies.
Building code
DuPage County Building Code, 2021 IBC, 2021 IRC, 2020 NEC, Illinois Plumbing Code.
Owner-builder
Allowed.
Contractor requirements
General and trades must be registered annually.

Fees

Minimum permit fee
$100-$200 (Remodeling); $60 (Fence)
Plan check fee
Included in permit cost
Permit fee formula
$10 per $1,000 of valuation (Valuation calculated at $90/sq. ft. for new SFH)
Trade permit fee
Varies
Reinspection fee
Fees double for work without permit. Performance bonds required: $2,000 (New SFH), $400 (Additions), $100 (Misc)
Penalty (no permit)
Penalty for unpermitted work
Payment note
Online via ACA

Fees change. Verify current amounts at the official fee schedule (effective Current).

Work That Does NOT Require a Permit

  • Ordinary repairs/maintenance
  • Roof/siding overlays (max 2 allowed)

Important: Confirm exempt work categories with Building and Zoning Department before proceeding.

Inspections

How to Schedule

Scheduling deadline
Check portal for scheduling windows.
Inspection hours
Monday - Friday, 8:00 AM - 4:30 PM
Time windows
Standard business hours.

Typical inspection sequence: Foundation, Stormwater, Rough, Final.

Required to close permit and release bonds.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building and Zoning Department before applying.

Need help with your project?

Navigating permits in Unincorporated DuPage County can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.
← Back to DuPage County permit guides