City Building Permits
Village of Tolono, ILLINOIS Building Permit Guide
How to apply for a building permit in Village of Tolono, Illinois. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Village limits of Tolono, IL.
- Department
- Village of Tolono Village Office
- Address
- 507 W Strong Street, Tolono, IL 61880
- Phone
- 217-485-5212
- info@tolonoil.us
- Website
- https://tolonoil.us
Online Permit Portal
Platform: Paper/PDF Forms • Account required: No • Submission: In-person only
Application Process
- Download PDF application from Village website.
- Submit form with drawings and site plan via email or in person.
- Review by Building Official and Zoning Administrator.
- Pay fees at Village Hall upon approval.
- Pick up physical permit.
- Post permit at job site before starting work.
Typical processing time: Not stated; depends on complexity.
Source: Village of Tolono Village Office
General Requirements
New construction, reconstruction, renovations, additions, decks, fences, sheds, garages.
Required Documents
- Application
- Site plan (3 copies)
- Project drawings
- Permit validity
- Valid for 1 year; work must start within 6 months.
- Building code
- 2018/2021 IBC/IRC per state mandate.
- Owner-builder
- Standard owner provisions apply.
- Contractor requirements
- Contractors must be registered; $25 fee for state-licensed trades (Plumbing/Roofing). General contractors must obtain Village license.
Fees
- Minimum permit fee
- $45.00 (Decks); $50.00 (Sheds); $100.00 (Fences)
- Plan check fee
- Typically included.
- Permit fee formula
- Flat fees: $500-$600 for new construction; $75 for general renovation. Additions $25 per 100 sq. ft.
- Trade permit fee
- Included in permit fee structure
- Reinspection fee
- Fees for missed inspections
- Penalty (no permit)
- Varies
- Payment note
- Payment at Village Hall.
Fees change. Verify current amounts at the official fee schedule (effective 2026-03).
Work That Does NOT Require a Permit
- Normal repairs not involving structural alterations
Important: Confirm exempt work status with Village before proceeding.
Inspections
How to Schedule
- 217-485-5212 (phone)
- Scheduling deadline
- Standard business hours.
- Inspection hours
- Standard business hours
- Time windows
- Call for availability.
Typical inspection sequence: Typical sequence: Footing, Framing/Rough-in, Final. (Note: Some docs suggest owner responsibility for technical inspections).
Contact department for remote inspection availability.
Additional Resources
- Building code: 2018/2021 IBC/IRC per state mandate.
- Zoning information: View zoning info
- Village Ordinances
- License lookup guide: Illinois Contractor License Requirements
- Contract template: Illinois Homeowner-Contractor Agreement
- Illinois hub: Illinois Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Village of Tolono Village Office before applying.
Need help with your project?
Navigating permits in Village of Tolono can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Champaign County
View all Champaign County jurisdictions →