County Building Permits

Champaign County Building Permit Guide (Unincorporated Area)

How to apply for a building permit in unincorporated Champaign County, Illinois. Permit authority, application steps, fees, and inspection requirements.

Illinois Updated March 2026

Permit Authority

Unincorporated area of Seymour, IL (Champaign County).

Department
Champaign County Department of Planning & Zoning
Address
1776 E. Washington Street, Urbana, IL 61802
Phone
217-384-3708

Online Permit Portal

Platform: Paper/PDF Forms • Account required: No • Submission: In-person only

Application Process

  1. Submit Zoning Use Permit Application (ZUPA) with site plan.
  2. Review for compliance with setbacks, lot coverage, and use.
  3. Pay fees upon notification.
  4. Zoning Use Permit issued.
  5. Construction must start within 180 days.
  6. Final inspection upon completion for Compliance Certificate.

Typical processing time: 1 to 2 weeks for standard; 45+ days for Special Use.

Source: Champaign County Department of Planning & Zoning

General Requirements

All construction (homes, additions, sheds, garages).

Required Documents

  • ZUPA form
  • Detailed site plan
  • Legal description (PIN)
Permit validity
1 year for completion; 180 days to start.
Building code
Champaign County Zoning Ordinance. (Note: PA 103-0510 mandates state code as of 1/1/2025).
Owner-builder
Standard owner provisions; must meet zoning.
Contractor requirements
State license for plumbing/roofing; no county GC license.

Fees

Minimum permit fee
$65.00 (Accessory); $260.00 (Principal)
Plan check fee
Stormwater review deposit $500 (if applicable).
Permit fee formula
Residential: $12.00 per 100 sq. ft. Principal: $260 flat. Certificate of Compliance: $33.00.
Trade permit fee
Included in permit fee structure
Reinspection fee
Included in fee structure
Penalty (no permit)
Surcharge for work without permit
Payment note
Payment at Brookens Center.

Fees change. Verify current amounts at the official fee schedule (effective 2026-03).

Work That Does NOT Require a Permit

  • Agricultural structures and uses (Agriculture Exemption)
  • Small sheds <150 sq. ft.

Important: Confirm exempt work status with County before proceeding.

Inspections

How to Schedule

  • 217-384-3708 (phone)
Scheduling deadline
Contact for scheduling.
Inspection hours
Monday-Friday, 8:00 AM - 4:30 PM
Time windows
Standard business hours.

Typical inspection sequence: Final Inspection (verify setbacks/use).

Contact department for remote inspection availability.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Champaign County Department of Planning & Zoning before applying.

Need help with your project?

Navigating permits in Seymour (Unincorporated) can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.
← Back to Champaign County permit guides