City Building Permits
Village of Smithboro, ILLINOIS Building Permit Guide
How to apply for a building permit in Village of Smithboro, Illinois. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Village of Smithboro defers building/zoning authority to Bond County.
- Department
- Bond County Building and Zoning Department (Village defers authority)
- Address
- 206 W. Main Street, Greenville, IL 62246
- Phone
- 618-664-9263
- Website
- https://bondcountyil.gov/zoning/
Online Permit Portal
Platform: Bond County Portal • Account required: No • Submission: Online only
Application Process
- Access Bond County online permit portal or visit County office.
- Submit application with construction cost and project description.
- Provide legal description of property and E911 address.
- County reviews plans.
- Pay fees and receive permit.
Typical processing time: Varies.
Source: Bond County Building and Zoning Department (Village defers authority)
General Requirements
New construction, additions, structural alterations, accessory structures (sheds, garages, decks), fences, pools, solar systems, demolition.
Required Documents
- Application
- Site plan
- Construction plans
- Legal description
- Building code
- 2021 International Building Code (IBC), 2021 International Residential Code (IRC), 2020 National Electrical Code (NEC), 2021 International Fire Code (IFC).
- Owner-builder
- Allowed.
- Contractor requirements
- State-licensed electricians and plumbers.
Fees
- Minimum permit fee
- $60.00
- Plan check fee
- Included in base fee.
- Permit fee formula
- Base fee for first $5,000 of cost; $40 for each additional $1,000 over $5,000.
- Reinspection fee
- $50.00 per inspection visit.
- Penalty (no permit)
- Double fees if work starts before permit issued.
- Payment note
- Checks payable to Bond County Building and Zoning.
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
- Cosmetic work (painting, flooring).
- Small sheds (verify with County if under 200 sq ft).
Inspections
How to Schedule
- 618-664-9263 or 618-237-9737 (phone)
- Inspection hours
- Standard business hours.
Typical inspection sequence: Typical sequence: foundation, framing, electrical, final.
Additional Resources
- Building code: 2021 International Building Code (IBC), 2021 International Residential Code (IRC), 2020 National Electrical Code (NEC), 2021 International Fire Code (IFC).
- Zoning information: View zoning info
- License lookup guide: Illinois Contractor License Requirements
- Contract template: Illinois Homeowner-Contractor Agreement
- Illinois hub: Illinois Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Bond County Building and Zoning Department (Village defers authority) before applying.
Need help with your project?
Navigating permits in Village of Smithboro can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Bond County
View all Bond County jurisdictions →