Permit Authority

Within the corporate limits of the City of Greenville.

Department
City of Greenville Municipal Building
Address
404 S. 3rd Street, Greenville, IL 62246
Phone
618-664-1644

Online Permit Portal

Platform:Account required: No • Submission: In-person only

Application Process

  1. Obtain application from City Hall or City Clerk's office.
  2. Submit completed application with construction plans for review.
  3. Plans are reviewed for zoning and code compliance.
  4. Pay applicable permit fees.
  5. Permit is issued; construction may begin.

Typical processing time: Varies by project complexity.

Source: City of Greenville Municipal Building

General Requirements

New construction, additions, alterations, repairs, or demolition.

Required Documents

  • Completed application
  • Site plan
  • Construction drawings (structural, electrical, plumbing)
Building code
2021 International Building Code (IBC) and 2021 International Residential Code (IRC) as required by Illinois Public Act 103-0510 (effective January 1, 2025). Note: City was previously following 2015 IBC/IRC.
Owner-builder
Allowed for primary residence.
Contractor requirements
Contractors must be registered; plumbers and electricians must be state licensed.

Fees

Minimum permit fee
$45.00
Plan check fee
$50 to $333+ based on project cost.
Permit fee formula
Valuation-based tiered schedule: $0–$2,000 = $45; $2,000–$3,000 = $50; higher valuations follow tiered formula.
Reinspection fee
$40.00 per visit for code violations.
Payment note
Checks or cash at City Hall.

Work That Does NOT Require a Permit

  • One-story detached accessory structures under 200 square feet.
  • Fences not over 7 feet high.
  • Retaining walls under 4 feet high.
  • Cosmetic work (painting, tiling, carpeting, cabinets).
  • Sidewalks and driveways less than 30 inches above grade.

Inspections

How to Schedule

  • 618-664-1644 (phone)
Inspection hours
Standard business hours.

Typical inspection sequence: Typical sequence: footing/foundation, framing, rough-in (electric/plumbing), final.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Greenville Municipal Building before applying.

Need help with your project?

Navigating permits in Greenville can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Bond County

View all Bond County jurisdictions →