City Building Permits

Town of Hilliard, FL Building Permit Guide

How to apply for a building permit in Town of Hilliard, Florida. Permit authority, application steps, fees, and inspection requirements.

Florida Nassau County Updated March 2026

Permit Authority

All properties within the incorporated Town of Hilliard

Department
Building Official and Permitting
Address
15859 West County Road 108, Hilliard, FL 32046
Phone
904-845-3555

Online Permit Portal

Application Process

  1. Download the building permit packet from the Forms, Permits, and Applications page, including application, checklist, and required forms.
  2. Submit Development Investigation Application with $150.00 fee as a pre-zoning gate; verify zoning classification and setbacks.
  3. Upon Development Investigation approval, prepare all documents on the building permit checklist.
  4. Gather required hard-copy documents: hard copies of insurance naming Town of Hilliard as certificate holder, recorded warranty deed, recorded notice of commencement (for projects over $5,000), and engineering/architectural plans.
  5. Prepare digital copies of all documents and checklists.
  6. Submit completed application with digital copies and hard copies by email to buildingpermits@townofhilliard.com or in person.
  7. Town staff reviews completeness and requests revisions if needed.
  8. Pay application and permit fees once all documentation is complete.
  9. Obtain issued permit and proceed with inspections at required phases.

Typical processing time: Processing times not specified by town; applicants should contact Building Official at 904-845-3555 or buildingpermits@townofhilliard.com for current timelines.

Source: Building Official and Permitting

General Requirements

Building permits are required for residential and commercial construction projects in the Town of Hilliard.

Required Documents

  • Development Investigation Application with $150.00 fee (completed before full permit intake)
  • Owner-builder affidavit if applicable
  • Property tax ID number
  • Survey and site plan showing setbacks
  • Valuation cost of construction
  • Two sets of engineered stamped plans
  • Two sets of truss plans with uplift connector table and roofing detail
  • Two sets of energy forms and final blower door test
  • Certified copy of notice of commencement (for construction valued at $2,500 or greater)
  • Culvert permit (where required)
  • Water/sewer tap and deposits (where required)
  • System development charge (where required)
  • Well and septic approval (where required)
  • St. Johns River Water Management District and/or DEP approval letter (where required)
  • Educational impact fee (for vacant-lot/new residential construction)
  • Hard-copy insurance documentation naming Town of Hilliard as certificate holder
  • Recorded warranty deed (hard copy)
Permit validity
Notice of commencement must be recorded for construction over $5,000 and posted on job site.
Building code
Florida Building Code as enforced through Building Official authority and Hilliard Town Code building regulations
Owner-builder
Owner-builders must submit owner-builder affidavit. The town's forms distinguish between licensed-contractor permits and owner-builder exemptions.
Contractor requirements
Contractors must provide required certified contractor information. Licensed contractors must hold current professional licensing.

Work That Does NOT Require a Permit

Important: The town administers a Development Investigation Application step before full permit processing, which serves as a zoning and land-use gate. All work subject to this gate requirement; exempt categories not separately identified in research.

Inspections

How to Schedule

  • Chelsea Wingate at 904-675-6171 (phone)
  • buildingpermits@townofhilliard.com (email)
Scheduling deadline
Contact Chelsea Wingate or Building Permits department for scheduling
Inspection hours
Office hours: Monday through Friday, 9:00 AM to 5:00 PM
Time windows
Not specified by town

Typical inspection sequence: The Building Official performs inspections at various construction stages as outlined in the building permit process.

Not specified by town

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Official and Permitting before applying.

Need help with your project?

Navigating permits in Town of Hilliard can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Nassau County

View all Nassau County jurisdictions →